Getting Started

Refer to the hardware documentation delivered with the Intergraph Computer Systems TDZ
workstation for instructions on setting up the workstation hardware and operating system software.
Follow the instructions in this section to prepare to install an ImageStation ZII system.

Unpack the Equipment

Unpack all equipment from the shipping cartons. In addition to the TDZ workstation base unit, a
keyboard, and a 21-inch, 24-inch, or 28-inch monitor, verify that you have the following items:
u
Monitor table (FFUR0530)
u
Digitizer stand (FFUR0540), D-sized digitizer table top with an Altek digitizer controller
(CTIS1410), a 15-pin to 9-pin Analog to Digital Converter, three 9-pin RS-232 cables, PEM
bracket (CFAB806F), and Handle Grommet (CGEN534A)
u
Wood screws (CPHW8760) for installing the PEM bracket
u
Interface PEM (MESAN360)
u
Two-Handed controller (MESAL150)
u
Cyborg chair (FFUR0080)
u
AC Adapter (CPWS1720)
Verify that you have the following components of the stereoscopic display subsystem.
u
Stereoscopic glasses (CINF0110)
u
Infrared transmitter (CINF0120)
u
Stereo sync interface cable (MCBLV320)
If any of the listed items are missing or damaged, notify the Customer Response Center at
1-800-633-7248.

Gather the Tools

Gather the following tools to use when installing the system:
u
Phillips screwdriver, #2 (for PEM bracket assembly)
u
Phillips screwdriver, #3 (for furniture assembly)
u
Flat-bladed screwdriver, 1/4-inch, common (for cable installation)
u
Wrench, 1/2-inch, box-end or small adjustable (for table casters)

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ImageStation ZII and is the answer not in the manual?

Questions and answers

Table of Contents