Installation Preparation; Tools And Materials Required; Remove The Packaging - GE Monogram ZV42I Installation Instructions Manual

Island vent hoods
Hide thumbs Also See for Monogram ZV42I:
Table of Contents

Advertisement

TOOLS AND MATERIALS REQUIRED

(NOT SUPPLIED)
Duct tape
Pencil and tape measure
Spirit level
Step ladder
Carpenter's square

REMOVE THE PACKAGING

• Remove the parts packages and packing materials.
• Lift the hood out of the box.
IMPORTANT:
the outside edges of the exhaust opening on the top.
Parts
Parts
Hood
Motor
Mounted
on Skid
Shipping Carton
• Place the hood on a protective surface to prevent
scratches and damage to the stainless steel finish.

Installation Preparation

Wire cutter/stripper
Safety glasses
Saber saw
or Sawsall
Pliers
Metal Snips
Lift the hood by grasping
Parts
7/16" Pivoting
hex socket with 4"
and 6" extensions
Key Hole Saw
Wire nuts
Flashlight
• Carefully, lay the hood on its side. A support frame is
secured to the inside top of the hood. Remove the
attachment screws at the outside top. Discard screws.
• Grasp the support
frame inside the
hood with both
hands and
carefully rotate out
of the opening.
Be careful not to
scratch the hood.
• The hood motor is shipped secured to the skid with 4
screws. Locate and remove 2 screws on each side of
the motor. Discard the shipping skid and screws.
8
Hammer
Electric or battery operated drill
and 3/16", bits, Phillips and Flat
Blade Screwdriver bits.
Phillips and flat blade
screwdrivers
120V 60Hz. 15 or 20 Amp,
2-wire with ground. Properly
grounded branch circuit.
10" round metal
duct, length to
suit installation.
Strain relief for
junction cover.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Monogram ZV42I and is the answer not in the manual?

This manual is also suitable for:

Monogram zv54i

Table of Contents