Traction Drive Cable Adjustment - Craftsman 536.881950 Operator's Manual

9.5 horsepower electric start dual stage
Table of Contents

Advertisement

Available languages

Available languages

[.,,."_o,,_
V_I Z IB]P'_"_
TRACTION
DRIVE
CABLE
ADJUSTMENT
1.
7. Push the bottom of the traction
2.
3.
Run the engine
until the fuel tank is
empty
and the engine
stops.
Stand
the snow thrower
up on the
front end of the auger
housing.
Loosen
the bolts
on each side of
the bottom
panel
(see
Figure 35).
Bolt
Bottom Panel
Figure 35
drive cable through the cable ad-
justment bracket until the "Z"
hook can be removed.
8. Remove the "Z" hook from the
cable adjustment
bracket.
Move
the "Z" hook down to the next ad-
justment hole.
9. Pull the traction
drive cable up
through the cable adjustment
bracket.
10. Put the cable boot over the cable
adjustment
bracket.
11. Install the "Z" hook to the traction
drive lever (see Figure 33).
12. To check the adjustment, depress
the drive lever and check the length
of one of the drive springs. In cor-
rect adjustment, the length of the
drive spring is:
minimum 3" (76 mm.)
maximum 3-3/8" (85 mm.)
(see Figure 37),
4.
Remove
the bottom
panel,
5.
Disconnect
the "Z"
fitting
from the
drive
lever
(see Figure 33).
6.
Slide the cable boot
off the cable
adjustment
bracket
(see
Figure
36).
3-3/8"
max,
Traction
Drive Cable
Drive Spring
Figure 37
Cable Adjustment
Bracket
"Z" Hook
Figure 36
F-O51005L
29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents