Traction Drive Cable Adjustment - Craftsman 536.887993 Operator's Manual

9 horsepower electric start dual stage
Table of Contents

Advertisement

Available languages

Available languages

_.'_o_
V:_ _ I my:_m_ll_,_l i _vA I_ _i i
TRACTION
DRIVE
CABLE ADJUSTMENT
1, Run the engine until the fuel tank is
7, Push the bottom of the traction
empty and the engine stops.
2, Stand the snow thrower up on the
front end of the auger housing,
3, Loosen the bolts on each side of
the bottom
panel (see Figure 25).
Bolt
Bottom Panel
Bolt
Auger
Housing
drive cable through the cable ad-
justment bracket until the "Z"
hook can be removed.
8, Remove the "Z" hook from the
cable adjustment
bracket.
Move
the "Z" hook down to the next ad-
justment hole.
9, Pull the traction
drive cable up
through the cable adjustment
bracket.
10, Put the cable boot over the cable
adjustment
bracket.
11, install the "Z" hook to the traction
drive lever (see Figure 23).
12, To check the adjustment,
depress
the drive lever and check the length
of one of the drive springs, in cor-
rect adjustment, the length of the
drive spring is:
minimum 3" (76 mm,)
maximum 3-3/8" (85 mm.)
(see Figure 27).
Figure 25
4, Remove the bottom
panel.
5, Disconnect the "Z" fitting
from the
drive lever (see Figure 23).
6, Slide the cable boot off the cable
adjustment
bracket (see
Figure 26).
Traction
Drive Cable
\
Cable Boot
Figure 27
"Z" Hook
Cable Adjustment
Bracket
Figure 26
F-031098L
24

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents