Download Print this page

Emerson 3700 Installation Instructions Manual page 16

Installation instructions for field-mount
Hide thumbs Also See for 3700:

Advertisement

(19 mm)
Gland nut
Gland clamping
4. For connection at the core processor housing, prepare shielded cable
as follows (for armored cable, omit steps d, e, f, g):
a. Strip 4 1/2 inches (114 mm) of cable jacket.
b. Remove the clear wrap that is inside the cable jacket, and remove
the filler material between the wires.
c. Remove the foil shield that is around the insulated wires, leaving
3/4 inch (19 mm) of foil or braid and drain wires exposed, and
separate the wires.
d. Wrap the shield drain wire(s) around the exposed foil twice. Cut
off the excess wire.
Shield drain wire(s) wrapped twice around exposed shield foil
e. Place the shielded heat shrink over the exposed shield drain
wire(s). The tubing should completely cover the drain wires.
f.
Without burning the cable, apply heat (250 °F or 120 °C) to shrink
the tubing.
3/4 in
insert
7/8 in
(22 mm)
4 1/2 in
(114 mm)
Shielded
heat shrink
15
7/8 in
Gland body
(22 mm)

Advertisement

loading

This manual is also suitable for:

3350