Installation And Start-Up Procedures; Tools And Test Equipment; Installation Procedure; Procedure 1 - Power Shelf Installation - Emerson MPR15 Series Installation And User Manual

Single phase −48v 25a switch mode rectifier
Table of Contents

Advertisement

Installation and start-up procedures

Tools and test equipment

The following tools and test equipment are required:

Installation procedure

Procedure 1 - Power shelf installation

Step
1
2
3
4
5
Potentiometer screwdriver Bourns Inc. No. 32
Potentiometer screwdriver Bourns Inc. No. 60
Screwdriver 3 inch
Digital voltmeter - Fluke 8000 A or equivalent
Dummy load
Position the power shelf against the rack.
Fasten the shelf in the position indicated on the drawings (normally
directly below the Controller or below another power shelf).
Release the clamping bar from the front of the power shelf (Refer to
Figures 10, 11 and 12).
Remove the AC junction box cover (left side) and store for re-
installation.
Remove the DC and control wiring area cover (right side) and store for
re-installation.
25A Switch Mode Rectifier NT5C06B / C Installation and User Manual
Action
–end–
41

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mpr25 seriesNt5c06bNt5c06c

Table of Contents