Installation and start-up procedures
Tools and test equipment
The following tools and test equipment are required:
Installation procedure
Procedure 1 - Power shelf installation
Step
1
2
3
4
5
Potentiometer screwdriver Bourns Inc. No. 32
Potentiometer screwdriver Bourns Inc. No. 60
Screwdriver 3 inch
Digital voltmeter - Fluke 8000 A or equivalent
Dummy load
Position the power shelf against the rack.
Fasten the shelf in the position indicated on the drawings (normally
directly below the Controller or below another power shelf).
Release the clamping bar from the front of the power shelf (Refer to
Figures 10, 11 and 12).
Remove the AC junction box cover (left side) and store for re-
installation.
Remove the DC and control wiring area cover (right side) and store for
re-installation.
25A Switch Mode Rectifier NT5C06B / C Installation and User Manual
Action
–end–
41