Download Print this page
Emerson Liebert Npower 30-130 kVA Installation Manual
Emerson Liebert Npower 30-130 kVA Installation Manual

Emerson Liebert Npower 30-130 kVA Installation Manual

30-130 kva, 60 hz single module systems 1+1 redundant systems

Advertisement

Quick Links

P
P
OWER
ROTECTION
I
M
NSTALLATION
ANUAL
30-130 kVA, 60 Hz
Single Module Systems
1+1 Redundant Systems

Advertisement

loading

Summary of Contents for Emerson Liebert Npower 30-130 kVA

  • Page 1 OWER ROTECTION ™ NSTALLATION ANUAL 30-130 kVA, 60 Hz Single Module Systems 1+1 Redundant Systems...
  • Page 2 The following WARNING applies to battery cabinets supplied with UPS sysems: INTERNAL BATTERY STRAPPING MUST BE VERIFIED BY MANUFACTURER PRIOR TO MOVING A BATTERY CABINET FROM ITS INITIAL INSTALLATION LOCATION. Battery cabinets contain non-spillable batteries. Keep units upright. Do not stack. Do not tilt.
  • Page 3 MPORTANT AFETY NSTRUCTIONS Save These Instructions.
  • Page 5 Table of Contents...
  • Page 7 List of Figures...
  • Page 9: List Of Tables

    Table 1 Power Wiring Terminals - Factory Supplied ..........28 Table 2 Torque Specifications .
  • Page 11 AFETY RECAUTIONS Safety Precautions...
  • Page 12 NSTALLATION ONSIDERATIONS Installation Considerations...
  • Page 13 Figure 1 Npower UPS modules, left-to-right: 30-50 kVA, 65-80 kVA and 100-130 kVA Installation Considerations...
  • Page 14 NLOADING AND ANDLING • Cut the metal banding straps and remove. • Unbolt and remove the four corner brackets retaining the 2x4 boards. • Use forklift to remove module from pallet. Unloading and Handling...
  • Page 15: Unloading And Handling

    Figure 2 Front view, Npower UPS module on pallet BAND USING POLYP. PLASTIC BANDING (3) PLACES BAG PLASTIC COVER UNDER CARDBOARD CORRUGATED # 72 CARDBOARD NOT SHOWN Figure 3 Top view, Npower UPS module on pallet (2) 2 X 4 X 33" LG CARDBOARD SHEET METAL BANDING 3/4"...
  • Page 16 NSPECTIONS External Inspections Internal Inspections Inspections...
  • Page 17 QUIPMENT OCATION General Instructions Special Considerations for 1+1 Redundant Systems Equipment Location...
  • Page 18 ATTERY NSTALLATION Battery Safety Precautions Battery Installation...
  • Page 19 Battery Safety Precautions in French Per CSA Requirements Instructions Importantes Concernant La Sécurité Conserver Ces Instructions Battery Installation...
  • Page 20 Battery Installation...
  • Page 21 Matching Battery Cabinets Battery Installation...
  • Page 22 Non-Standard Batteries Battery Installation...
  • Page 23 ONFIGURING EUTRAL AND ROUND ONNECTIONS Configuring Your Neutral and Ground Connections...
  • Page 24 Figure 4 Grounding Diagram, A/B or G/H UPS Models, Wye Source, 3-Wire Loads Grounding for A/B or G/H UPS Models, Wye Source, 3-Wire Loads Configuring Your Neutral and Ground Connections...
  • Page 25 Figure 5 Grounding Diagram, A/B or G/H UPS Models, Wye Source, 4-Wire Loads Grounding for A/B or G/H UPS Models, Wye Source, 4-Wire Loads Configuring Your Neutral and Ground Connections...
  • Page 26 Figure 6 Grounding Diagram, D/E or K/L UPS Models, Delta or Wye Source, 4-Wire Loads Grounding for D/E or K/L UPS Models, Delta or Wye Source, 3- or 4-Wire Loads Configuring Your Neutral and Ground Connections...
  • Page 27 Figure 7 Grounding Diagram, R/S or X/Y UPS Model, Delta Source, 3-Wire Loads Grounding for R/S or X/Y UPS Models, Delta Source, 3-Wire Loads Configuring Your Neutral and Ground Connections...
  • Page 28 Figure 8 Grounding Diagram, A/B or G/H UPS Models, 1+1 Configuration A/B CONFIGURATION 4W+G 3W+G A/B CONFIGURATION 4W+G 3W+G Grounding for A/B or G/H UPS Models, 1+1 Configuration Configuring Your Neutral and Ground Connections SYSTEM PARALLELING CABINET 4W+G 4W+G 3 OR 4W+G CRITICAL LOAD...
  • Page 29 Figure 9 Grounding Diagram, D/E or K/L UPS Models, 1+1 Configuration D/E or K/L CONFIGURATION 3W+G 3W+G D/E or K/L CONFIGURATION 3W+G 3W+G Grounding for D/E or K/L UPS Models, 1+1 Configuration 4W+G 4W+G Configuring Your Neutral and Ground Connections SYSTEM PARALLELING CABINET 3 OR 4W+G CRITICAL...
  • Page 30 Figure 10 Grounding Diagram, R/S or X/Y UPS Models, 1+1 Configuration R/S or X/Y CONFIGURATION 3W+G 3W+G R/S or X/Y CONFIGURATION 3W+G 3W+G Grounding for R/S or X/Y UPS Models, 1+1 Configuration Configuring Your Neutral and Ground Connections 4W+G 4W+G SYSTEM PARALLELING CABINET 3W+G ONLY LOCAL...
  • Page 31 Grounding for 2 Npower UPS Modules feeding a Static Transfer Switch Grounding Configurations, Battery Systems Configuring Your Neutral and Ground Connections...
  • Page 32 IRING ONSIDERATIONS 7DEOH  Wiring Considerations...
  • Page 33 Power Wiring Wiring Considerations...
  • Page 34 Control Wiring Wiring Considerations...
  • Page 35 Battery Wiring Wiring Considerations...
  • Page 36 IRING ONNECTIONS DC power cables (and ground) from Battery Cabinet to UPS Module, and between Battery Cabinets. Wiring Connections...
  • Page 37 Observe polarity. DC power cables should be installed in matched pairs (positive and negative). Wiring Connections...
  • Page 38 10.0 W IRING NSPECTION Table 1 Power Wiring Terminals - Factory Supplied UPS Module Rating 30-130 kVA Use 75°C copper wire. Select wire size based on the ampacities in Table 310-16 (see Table 3 of this manual) and associated notes of the National Electrical Code (NFPA 70). Use commercially available solderless lugs for the wire size required for your application.
  • Page 39 Table 3 Table 310-16 Allowable Ampacities of Insulated Conductors Rated 0-2000 Volts, 60° to 90°C (140° to 194°F) Not More than Three Conductors in Raceway or Cable or Earth (Directly Buried), based on Ambient Temperature of 30° (86°F) Size Temperature Rating of Conductor. See Table 310-13. 60°C 75°C (140°F)
  • Page 40 11.0 I NSTALLATION RAWINGS Figure 11 Outline Drawing, 30-50 kVA UPS Installation Drawings...
  • Page 41 Figure 12 Outline Drawing, 65-80 kVA UPS Installation Drawings...
  • Page 42 Figure 13 Outline Drawing, 100-130 kVA UPS Installation Drawings...
  • Page 43 Figure 14 Outline Drawing, Battery Power Pack, 25-Inch Cabinet Installation Drawings...
  • Page 44 Figure 15 Outline Drawing, Battery Power Pack, 49-Inch Cabinet Installation Drawings...
  • Page 45 Figure 16 Outline Drawing, Maintenance Bypass Cabinet, “L” Configuration Installation Drawings...
  • Page 46 Figure 17 Outline Drawing, Maintenance Bypass Cabinet, “N” Configuration Installation Drawings...
  • Page 47 Figure 18 Outline Drawing, Maintenance Bypass Cabinet, “P” Configuration Installation Drawings...
  • Page 48 Figure 19 Outline Drawing, Maintenance Bypass Cabinet, “Q” Configuration Installation Drawings...
  • Page 49 Figure 20 Outline Drawing, Slimline Distribution Cabinet, Top Cable Exit, Panelboards Only Installation Drawings...
  • Page 50 Figure 21 Outline Drawing, Slimline Distribution Cabinet, Bottom Cable Exit, Panelboards Only Installation Drawings...
  • Page 51 Figure 22 Outline Drawing, Slimline Distribution Cabinet, with Panelboard and Subfeed Breakers Installation Drawings...
  • Page 52 Figure 23 Outline Drawing, Slimline Distribution Cabinet, with 100-250A Subfeed Breakers Only Installation Drawings...
  • Page 53 Figure 24 Outline Drawing, Slimline Distribution Cabinet, with 300-400A Subfeed Breakers Only Installation Drawings...
  • Page 54 Figure 25 Specifications Table, 1+1 Paralleling Panelboard Configuration “N” Installation Drawings...
  • Page 55 Figure 26 Outline Drawing, 1+1 Paralleling Panelboard, Configuration “N,” Size “A” Installation Drawings...
  • Page 56 Figure 27 Outline Drawing, 1+1 Paralleling Panelboard, Configuration “N,” Size “B” Installation Drawings...
  • Page 57 Figure 28 Outline Drawing, 1+1 Paralleling Panelboard, Configuration “N,” Size “C” Installation Drawings...
  • Page 58 Figure 29 Outline Drawing, Seismic Anchoring, 30-50 kVA UPS Installation Drawings...
  • Page 59 Figure 30 Outline Drawing, Seismic Anchoring, 65-80 kVA UPS Installation Drawings...
  • Page 60 Figure 31 Outline Drawing, Seismic Anchoring, 100-130 kVA UPS Installation Drawings...
  • Page 61 Figure 32 Outline Drawing, Remote Battery Breaker 30 - 130 kVA Installation Drawings...
  • Page 62 Figure 33 Outline Drawing, Remote Battery Breaker with Motor Operator, 30 - 130 kVA Installation Drawings...
  • Page 63 Figure 34 Outline Drawing, Remote Battery Breaker with BIB Installed Installation Drawings...
  • Page 64 Figure 35 Outline Drawing, Remote Alarm Status Panel Installation Drawings...
  • Page 65 Figure 36 Outline Drawing, LBS Control Panel Installation Drawings...
  • Page 66 Figure 37 Outline Drawing, LBS Alarm Status Contacts Installation Drawings...
  • Page 67 Figure 38 Outline Drawing, LBS Transformer Panel Installation Drawings...
  • Page 68 Figure 39 Control Wiring, LBS Interconnection Wiring Diagram for Configs A, B, R, S Installation Drawings...
  • Page 69 Figure 40 Control Wiring, LBS Interconnection Wiring Diagram for Configs D, E Installation Drawings...
  • Page 70 Figure 41 Control Wiring, 30 - 130 kVA UPS Installation Drawings...
  • Page 71 Figure 42 Control Wiring, 1+1 Category 5 Patch Cable Connection Installation Drawings...
  • Page 72 Figure 43 Control Wiring, 1+1 Twisted-Pair Cable Connection Installation Drawings...
  • Page 73 Figure 44 Control Wiring, Remote Alarm Status Panel Option Installation Drawings...
  • Page 74 Figure 45 Control Wiring, 2 or 3 Remote Alarm Status Panels Installation Drawings...
  • Page 75 Figure 46 Control Wiring, 3 Remote Alarm Status Panels with Stub Connections Installation Drawings...
  • Page 76 Figure 47 Control Wiring, Site Scan Interface Installation Drawings...
  • Page 77 Figure 48 Control Wiring, Programmable Relay Board Option Installation Drawings...
  • Page 78 Figure 49 Control Wiring, Input Contact Isolator Board Installation Drawings...
  • Page 79 Figure 50 Control Wiring, NIC Option Installation Drawings...
  • Page 80 Figure 51 Control Wiring, Power Supply Option Installation Drawings...
  • Page 81 Figure 52 Control Wiring, Internal Modem Option Installation Drawings...
  • Page 82 Figure 53 Control Wiring, AS 400 Signal Cable Option Installation Drawings...
  • Page 83 Figure 54 Control Wiring, Open Wire Cable Adaptor Option Installation Drawings...
  • Page 84 Figure 55 Control Connection Diagram 50 --130 kVA Installation Drawings...
  • Page 85 Figure 56 Control Connection Location Diagram, 30-130 kVA UPS Installation Drawings...
  • Page 86 Figure 57 Terminal Details, 30 - 50 kVA UPS Installation Drawings...
  • Page 87 Figure 58 Terminal Details, 65 - 80 kVA UPS Installation Drawings...
  • Page 88 Figure 59 Terminal Details, 100 - 130 kVA UPS Installation Drawings...
  • Page 89 Figure 60 Schematic Diagram Maintenance Bypass Interlock System Installation Drawings...
  • Page 90 Figure 61 Schematic Diagram Maintenance Bypass Interlock System with EPO Installation Drawings...
  • Page 91 Figure 62 Line-Up Detail Maintenance Bypass and Distribution Cabinets Installation Drawings...
  • Page 92 Figure 63 Wiring Diagram, UPS with Single Battery Cabinet Installation Drawings...
  • Page 93 Figure 64 Interconnection Diagram, UPS Module with Multiple Battery Cabinets Installation Drawings...
  • Page 94 Figure 65 Circuit Breaker Schedule, Maintenance Bypass Cabinet, 30 - 130 kVA Installation Drawings...
  • Page 100 ™ The Company Behind the Products With over a million installations around the globe, Liebert is the world leader in computer protection systems. Since its founding in 1965, Liebert has developed a complete range of support and protection systems for sensitive electronics: •...