CDA RC 9000 Users operating instructions Operating And Installation Instructions page 36

Table of Contents

Advertisement

Gas connection
The gas supply must use the nearest gas inlet pipe which is located at the left or the
right hand side at the rear of the appliance (figs. 35, 37).
The hose should also be connected in such away that it does not touch the floor.
To screw the connecting tube operate with two spanners (fig. 36).
The unused end inlet pipe must be closed with the plug interposing the gasket.
After connecting to the mains, check that the coupling are correctly sealed,
using soapy solution, but never a flame.
Left gas
inlet pipe
36
GB
Cat: II 2H3+
Right gas
inlet pipe
Plug
Fig. 35
Fig. 36
1/2" BSP (male)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rc 9000 series

Table of Contents