If you have other options to install or remove, do so now; otherwise, go to

"Completing the installation."

Completing the installation
To complete the installation, you must reinstall the two-piece bezel, reinstall the side
cover, connect all the cables and, for certain options, run the Configuration/Setup
Utility program. Follow the instructions in this section.

Reinstalling the two-piece bezel

To reinstall the two-piece bezel, complete the following steps:
1. Install the upper bezel on the front of the server chassis:
44
xSeries 206m Types 8485 and 8490: User's Guide
the cable cannot be removed. Fasten the cable ends together with a lock. After
you add the security cable, make sure that it does not interfere with other
cables that are connected to the server.
a. Insert the two right-side tabs on the upper bezel into the matching holes on
the right side of the chassis.
b. Rotate the upper bezel to the left side of the chassis and press the bezel
clips into the matching indentations on the left side of the chassis until the
bezel clips snap into place.