IBM 7316 - TF1 Rack Console Installation And Maintenance Manual page 22

17-inch flat panel rack-mounted monitor and keyboard
Table of Contents

Advertisement

13. Pull the tray out of the rack until it is extended fully on the rails.
14. Carefully lift the front of the flat-panel monitor, then raise the monitor to the full upright position.
15. Carefully insert the keyboard into the tray. Then, route the keyboard-and-mouse cable through the
cord clip on the bottom of the tray, up through the opening on the right side of the tray, and toward
the cable-management arm. Pull the full length of the cable through the opening.
16. Lay the keyboard-and-mouse cable on the tray just behind the monitor. Make sure that the cable will
not catch on other devices in the rack when the tray is pushed into the rack. The cables will be
routed through the cable-management arm in the next steps.
17. Carefully lower the monitor to the down position and then push the tray all the way into the rack and
secure the front of the tray to the rack using the thumbscrews.
18. From the rear of the rack, remove the shipping straps that are holding the cable-management arm to
the tray.
19. Route the keyboard-and-mouse cable through the cable-management arm and secure the cables
using the existing cable straps.
8
7316-TF3 17-Inch Flat Panel Rack-Mounted Monitor and Keyboard: Installation and Maintenance Guide
Keyboard-and-mouse
cable routing

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eserver 7316-tf3

Table of Contents