This command displays status information for the power supplies and the fans. The
power supplies are numbered from left to right. These numbers assume you are
facing the front of the device, not the rear.
If the display indicates "Installed (Failed)" for any of the slots, the power supply
installed in that particular slot has failed.
Replacing AC power supplies
Use the following procedures for AC power supplies in B24X devices.
You will need a #2 Phillips-head screwdriver to perform these procedures.
Figure 14 shows a front view of the AC power supply.
Figure 14. AC power supply
Removing an AC power supply
Follow these steps to remove an AC power supply.
1. Unplug the power cord from the power source.
2. Disconnect the power cord from the power supply.
3. Loosen the two captive power supply locking screws located on the sides of the
34
IBM x-series of Ethernet Switches Installation and User Guide
power supply.