Test Procedures

The server and all clients were rebooted prior to each test run. Once the
server and clients had successfully booted, the required number of TSE client
sessions (i.e., 1-6 client sessions per client workstations) was started on each
client. Then, the Performance Monitor was started as a background task on
the server. Each Visual Test script was then started manually, as quickly as
possible. Once all the clients had completed execution of the script, the
Performance Monitor was stopped and all temporary files were deleted from
the server.

Test Results

This section characterizes the behavior (i.e., elapsed time, processor
utilization, network utilization and memory utilization) of HP NetServers with
various client loads (i.e., 1, 12, 24, 36, 48, 60 and 72).
In order to establish an application baseline (0) value, the script was run at the
server and the Performance Monitor was used to monitor server activity. The
application baseline value is included on some of the charts under the "0"
column.