HP StorageWorks 2/128 - SAN Director Switch Release Note page 13

Fabric os 4.2.x
Hide thumbs Also See for StorageWorks 2/128 - SAN Director Switch:
Table of Contents

Advertisement

Table 3: SAN Director 2/128 Information
SAN Director 2/128
CP blade
Power supplies
Card seating
SAN Director 2/128 Fabric OS 4.2.x Release Notes
The SAN Director 2/128 CP contains electronics that provide internal
routing bandwidth, and are always active on both CPs. Removal of a CP
might affect user performance and therefore should not occur until a
replacement CP is ready to be installed.
A fully configured SAN Director 2/128 with eight port cards and two CPs is
capable of running on a single power supply. Therefore, two power
supplies provide 2N redundancy. To maintain redundancy of AC input, one
power supply must be in an even-numbered slot and one in an
odd-numbered slot. The default configuration is for the power supplies to be
in slots 1 and 2.
Follow the procedure below to ensure that Port Cards and Control Processor
(CP) cards are properly installed into your SAN Director 2/128:
1. Install the leading edge of the CP or Port Card into the appropriate slot
on the card cage.
2. Push the front surface of the card (SFP cage side) carrier near the center
with your hand until the top and bottom ejectors engage the upper and
lower ejector plates (do not hold onto the ejectors as you push).
3. Press down on both ejectors at the same time with equal force to seat the
blade.
4. Tighten the top thumb screw first.
Description
Important Notes
13