Brother PT-9600 Service Manual page 76

Service manual
Hide thumbs Also See for PT-9600:
Table of Contents

Advertisement

Reassembling the Eject Idle Gear and Double Gear 1
(1)
Assemble such the components as retaining ring, eject idle gear, and double gear 1 on the
chassis ASSY in this order.
Chassis ASSY
Fig. 3.2-22 Reassembling the Eject Idle Gear and Double Gear 1
Reassembling the Tape Feed Motor
(1)
Assemble the tape feed motor on the chassis ASSY with two screws.
Chassis ASSY
Fig. 3.2-23 Reassembling the Tape Feed Motor
III-42
Retaining ring
Double gear 1
Eject idle gear
Tape feed motor
Screws

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pt-3600

Table of Contents