Download Print this page

Edelbrock E-Force 1580 Installation Instructions Manual page 8

4.6l mustang gt supercharger system for 2005 and later mustang gts

Advertisement

7. Use an 8mm socket with a 12" extension bar to
remove the three bolts holding the battery tray in place,
then use a panel puller to detach the wiring harness clip.
Remove and set aside the tray.
Bolts
8. Use a flat blade screwdriver to pry up the head of the
six push-pins that retain the radiator shroud, then use a
panel puller to fully remove the push-pins. Lift the shroud
off the car and set it and the push-pins aside.
©2011 Edelbrock LLC
Part #1580 & 1585
III. Removing Engine Components
9. Detach the charge motion control valve (CMCV)
electrical connector at the rear of the manifold. Seperate
the wiring retainers from the intake manifold stud and the
CMCV bracket, then move the wiring harness to the side.
Wiring Harness Clip
10. Detach the throttle position sensor (TPS) and
electronic throttle control (ETC) connectors from the
throttle body.
ETC
Page 8
Edelbrock 4.6L Ford Supercharger System
for 2005 and later Mustang GTs
Installation Instructions
TPS
Brochure #63-1580
Rev. 1/11 - AJ/mc

Advertisement

loading

This manual is also suitable for:

E-force 1585