Step 3: Checking The Installation; Step 4: Connecting Devices To The Switch - NETGEAR GS728TS Hardware Installation Manual

Gs7xxts-tps hardware installation guide
Hide thumbs Also See for GS728TS:
Table of Contents

Advertisement

GS728TS, GS728TPS, GS752TS, and GS752TPS Smart Switch Hardware Installation Guide
4.
Align the mounting holes in the brackets with the holes in the rack, and insert two pan-head
screws with nylon washers through each bracket and into the rack.
5.
Tighten the screws with a #2 Phillips screwdriver to secure mounting brackets to the rack.
Figure 12. Rack Mount

Step 3: Checking the Installation

Before applying power to the switch, perform the following steps:
Inspect the equipment thoroughly.
Verify that all cables are installed correctly.
Check cable routing to make sure cables are not damaged or creating a safety hazard.
Ensure all equipment is mounted properly and securely.

Step 4: Connecting Devices to the Switch

The following procedure describes how to connect PCs to the switch's RJ-45 ports. The
GS728TS, GS728TPS, GS752TS, and GS752TPS Smart Switch contains Auto Uplink
technology, which allows the attaching of devices using either straight-through or crossover
cables.
26 |
Chapter 4. Installation

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gs752tpsGs752tsGs728tps

Table of Contents