Hitachi NR90GC - 3-1/2" Gas Powered Clipped Head Framing Nailer Technical Data And Service Manual page 66

Gas strip nailer
Hide thumbs Also See for NR90GC - 3-1/2" Gas Powered Clipped Head Framing Nailer:
Table of Contents

Advertisement

(b) Reassembly
Reassembly procedures should be followed in the reverse order. Note the following points.
Be careful of the split direction of the Roll Pin D2.5 x 10 [99] when mounting the Trigger [98] and Internal Wire
(A) [86]. Do not damage the plunger of the switch (Fig. 55).
Perform wiring of the Controller [101] and Internal Wire (A) [86] as shown in Fig. 56. Position the other parts
as shown in Fig. 56. Do not apply tension to the high-voltage cable of the Controller [101] and the connector
of Internal Wire (A) [86] (Fig. 56).
Mount the Wiring Cover [103] to Handle (B) [84] then hang the Chamber Lock Bar [100] on the ring of the
Lock Bar Spring [102]. Hang the magazine plate on the claw of Handle (B) [84] (3 places) (Fig. 58).
Be careful of the mounting direction of the Tension Plate [113] (Fig. 59).
Roll Pin D2.5 x 10 [99]
Internal Wire (A) [86]
Fig. 55
--- 63 ---
Split
Plunger
Trigger [98]

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nr 90gc

Table of Contents