Download Print this page

Craftsman 24594 - Professional Universal Broadcast Spreader Operator's Manual page 5

175lb professional spreader

Advertisement

STEP 4:
(SEE FIGURE 4)
10. Assemble a spacer (I), a 3/4" fiat washer (G), a wheel
(air valve facing out) and another 3/4" fiat washer (G)
onto the end of the axle that has both the large and
small holes.
11. install a 3/8" × 1-1/2" cotter pin (E) into the small hole
in the end of the axle.
12. Open the bail on the drive pin (J) and install it through
the wheel and the large hole in the axle. Close the
bail to lock the pin in place.
(J) DRIVE PiN
x
(E) 1/8"× 1-1/2"
X_
COTTER PiN
FIGURE 4
(I) SPACER
(G) 3/4" FLAT
WASHER
STEP 5:
(SEE FIGURE 5)
9.
Hook the double bent end of the flow control rod
through the hole in the slide gate bracket located
near the bottom of the hopper.
HOPPER
SLIDE
GATE
BRACKET
)
FIGURE 5
FLOW CONTROL
ROD
STEP 6:
(SEE FIGURE 6)
7.
Turn the spreader upright on its wheels.
8.
Assemble the flow control mounting tube to the hitch
tube using two 5/16"x 1-3/4" he× bolts (A) and 5/16"
nylock hex nuts (D). DO NOTTIGHTEN YET.
FLOW
CONTROL
MOUNTING
TUBE
(A) 5/16"
x 1-3/4"
HEX BOLT
FIGURE 6
STEP 7:
(SEE FIGURE 7)
13. Assemble the two INNER hitch braces to flow control
mounting tube using a 1/4" × 1-3/4" he× bolt (B) and a
1/4" nylock he× nut (C). DO NOT TIGHTEN YET.
14. TIGHTEN all nuts and bolts assembled up to this
point. Do not collapse the tubes when tightening.
(C) 1/4" NYLOC_
HEX
HITCH BRACE
INNER
FLOW
CONTROL
IVIOUNTING TUBE
\
HITCH BRACE
iNNER
FIGURE 7
Call 1-866-576-8388
for missing parts or assembly help
5
DO NOT RETURN TO STORE

Advertisement

loading

This manual is also suitable for:

71-24594