Powering Down The Server - Compaq 195294-001 - ProLiant - ML370R Setup And Installation Manual

Compaq proliant ml370 generation 2 server setup and installation guide
Hide thumbs Also See for 195294-001 - ProLiant - ML370R:
Table of Contents

Advertisement

3-12 Compaq ProLiant ML370 Generation 2 Server Setup and Installation Guide

Powering Down the Server

Table 3-7
System Board Components
Item
Description
PCI expansion slot 4
(64-bit/33-MHz)
PCI expansion slot 5

(64-bit/33-MHz)
PCI expansion slot 6

(64-bit/33-MHz)
System maintenance

switch (SW1)
16-pin Remote

Management connector
30-pin Remote

Management connector
Power supply signal

header
Power supply connector

Diskette drive connector

NOTE: Your server is configured for the appropriate switch settings at the factory.
If you are adding hardware options to a new server that is not yet installed in a
rack or work area, install all hardware options before installing and powering
up the server.
If your server is already installed, you must power down the system before
adding non-hot-plug hardware options.
IMPORTANT: Before upgrading components, back up your server data.
To power down the server:
1. Shut down the operating system as directed in your operating system
instructions. This measure enables you to retain system power for use in
performing diagnostic or troubleshooting operations.
continued
Item









Description
SCSI connector B
SCSI connector A
Fan cable connector
PPM slot 2
Processor socket 2
Processor socket 1
PPM slot 1
IDE connector
DIMM slots

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant ml370 generation 2

Table of Contents