Item
Powering Down the Server
To power down the server:
1. Schedule downtime for the server upgrade.
2. Perform a system backup of your server according to your operating
system requirements.
3. Power down your server according to your network operating system
requirements.
4. Power down the server, and then power down all peripheral devices.
5. Disconnect the AC power cord from the AC outlet, and then from the
server.
6. Label and disconnect all cables connected to the back of the server.
Conversion Kit Contents
Description
Bar nut
Cable management arm
mounting bracket
Cable management arm bracket
Template
Rack-mount front panel
Documentation
CAUTION: Never power down a storage system unless the server controlling it
has been powered down first. Powering down the storage system first causes
the controller to mark the drives as failed.
Table 1-1
Item
Description
Screws and cage nuts (6 bags)
Slide rail assemblies
Rail mounting brackets
Tiewraps
Cable management arm
Preparing the Server 1-3