Other Options
The ProLiant DL320 server also supports several rack-mounting options. For
more information, see "Optional Rack Deployment Solutions" and
"Desktop/Stackable Chassis Option" in Chapter 1, "Server Features."
For more information about these options, contact your Compaq authorized
reseller.
Preparing the Server
To prepare the server for installation of the hardware options, you may need to
complete the following procedures:
I
Powering down the server
I
Removing the access panel
I
Removing the shipping/ejector key
I
Removing the PCI riser board assembly
I
Removing the center wall
I
Identifying the system board components
I
Installing the center wall
I
Installing the access panel
Powering Down the Server
To install hardware options, you must first remove all power from the system.
Use the following procedure to power down the server before installing the
hardware options:
1. If you intend to install hardware options, back up your server data.
2. Shut down the operating system as directed in your operating system
instructions.
NOTE: Steps 3 through 5 and Step 8 apply to servers that have already been mounted in
a rack.
Installing Hardware Options 3-3