Excite Coil Inspection; Pulse Generator Inspection - DAELIM S-FIVE Service Manual

Hide thumbs Also See for S-FIVE:
Table of Contents

Advertisement

IGNITION SYSTEM
INSPECTION (RESISTANCE MEASUREMENT)
● Remove the luggage box. ( 3-3 )
● Measure primary coil resistance between the green and
black/yellow terminals.
STANDARD VALUE : 0.1~0.5Ω(20℃)
● Measure the secondary coil resistance between the plug
cap and green wire terminals.
RESISTANCE VALUE
(SPARK PLUG CAP CONNECTION) : 6.5~9.5
● The coil which the resistance value indicate
"∞"(disconnection) remove the plugcap, and measure
the resistance of secondary coil.
● Measure the resistance between the high tension code
and green code terminals.
RESISTANCE VALUE : 2.6 1.25

EXCITE COIL INSPECTION

NOTE
·Assembly the spark plug to the cylinder head, and
inspect in an state having compression pressure.
● Remove the luggage box. ( 3-3 )
● Remove the connection of the AC Generator wire
connector (black/red), measure the resistance between
the terminal of AC generator and body earth.
STANDARD VALUE : 500Ω 20 (20℃)

PULSE GENERATOR INSPECTION

NOTE
·The inspection of pulse generator is performed in a
state assembling to the engine.
● Remove the luggage box. ( 3-3 )
● Remove the connection of the AC generator 6P
coupler, and measure the resistance between the blue/
yellow of starter and green code.
STANDARD VALUE : 100Ω 20 (20℃)
14-6
(20℃)
(20℃).

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sj50S-five sj50e

Table of Contents