Install The Switch - NETGEAR GSM7328Sv1 - ProSafe 24+4 Gigabit Ethernet L3 Managed Stackable Switch Hardware Installation Manual

Managed stackable layer 3 switches
Hide thumbs Also See for GSM7328Sv1 - ProSafe 24+4 Gigabit Ethernet L3 Managed Stackable Switch:
Table of Contents

Advertisement

Managed Stackable Layer 3 Switches GSM7328S v2 and GSM7352S v2 Hardware Installation

Install the Switch

You can install the switch on a flat surface or in a standard 19-inch rack.
Installing the Switch on a Flat Surface
The switch ships with four self-adhesive rubber footpads. Stick one rubber footpad on each of the
four concave spaces on the bottom of the switch. The rubber footpads cushion the switch against
shock and vibrations.
Installing the Switch in a Rack
To install the switch in a rack, you will need the 19-inch rack-mount kit supplied with your switch.
1. Attach the supplied mounting brackets to the side of the switch.
2. Use the provided Phillips head screws to fasten the brackets to the sides of the switch.
Figure 3-1
3. Tighten the screws with a No. 1 Phillips screwdriver to secure each bracket.
Hardware Installation
mounting
bracket
v1.0, July 2009
3-5

Advertisement

Table of Contents
loading

Table of Contents