Managed Stackable Layer 3 Switches GSM7328S v2 and GSM7352S v2 Hardware Installation
Installation
Install the equipment in the sequence presented in this chapter, as shown below:
1. Select a Location.
See
"Select a Location" on page
2. Install the Switch.
See
"Install the Switch" on page
3. Check the installation.
See
"Check the Installation" on page 3-6
4. Apply power and check the LEDs.
See
"Connect to Power and Check the LEDs" on page