Download Print this page
Huawei UPS5000-E-300K-SM Quick Manual
Huawei UPS5000-E-300K-SM Quick Manual

Huawei UPS5000-E-300K-SM Quick Manual

50 kva power modules
Hide thumbs Also See for UPS5000-E-300K-SM:

Advertisement

Quick Links

UPS5000-E-300K-SM
(50 kVA Power Modules)
Quick Guide
Issue: 12
Date: 2025-01-15
Copyright © Huawei Digital Power Technologies Co., Ltd. 2025. All rights reserved.
Installation Preparation
• Before installing the equipment, read the product documentation carefully to get familiar with
product information and safety precautions. Equipment damage caused by failure to abide by
the storage, transportation, installation, and operation guidelines specified in the product
documentation is not covered by the product warranty. Log in to the technical support website
to view the product documentation and safety precautions.
• The information in this document is subject to change without notice. Every effort has been
made in the preparation of this document to ensure accuracy of the contents, but all
statements, information, and recommendations in this document do not constitute a warranty
of any kind, express or implied.
• Only qualified personnel are allowed to perform operations on the equipment. Operation
personnel should understand the system, its working principles, and relevant national/regional
standards.
• Wear dedicated personal protective equipment during operations. Use dedicated insulated tools
during electrical operations.
Environment requirements
440 kg
Operating
Relative humidity
Floor and support
The equipment
temperature
0%–95% RH
load capacity
room is airtight.
0–40°C
(non-condensing)
Heat source,
Dust or
Water source,
inflammable or
Direct sunlight
conductive
water vapor
explosive article
metal dust
Clearance
Unit: mm
Recommended Circuit Breaker Specifications for
a 380 V AC/400 V AC/415 V AC Voltage System
When the Short-circuit Current Going Through the Device
Capacity
300 kVA
250 kVA
200 kVA
150 kVA
100 kVA
50 kVA
Recommended Cable Specifications for
a 380 V AC/400 V AC/415 V AC Voltage System (mm
Capacity
Mains Input
L1: 2×150
L2: 2×150
L3: 2×150
300 kVA
N: 2×150
PE: 150
L1: 2×120
L2: 2×120
L3: 2×120
250 kVA
N: 2×120
PE: 120
L1: 2×95
L2: 2×95
L3: 2×95
200 kVA
N: 2×95
PE: 95
L1: 2×70
L2: 2×70
L3: 2×70
150 kVA
Excessive
N: 2×70
salt content
PE: 70
L1: 70
L2: 70
L3: 70
100 kVA
N: 70
PE: 35
L1: 25
Volatile or
L2: 25
corrosive
L3: 25
50 kVA
substance
N: 25
PE: 25
Is Less than 36 kA
Mains Input
Bypass Input
Output
630 A/3P
630 A/3P
630 A/3P
630 A/3P
400 A/3P
400 A/3P
400 A/3P
400 A/3P
400 A/3P
320 A/3P
250 A/3P
250 A/3P
250 A/3P
160 A/3P
160 A/3P
160 A/3P
100 A/3P
100 A/3P
2
)
Equipotential
Bypass Input
Output
Battery Input
Ground
L1: 2×150
U: 2×150
+: 2×185
L2: 2×150
V: 2×150
N: 2×185
L3: 2×150
W: 2×150
GND:16
-: 2×185
N: 2×150
N: 2×150
PE: 185
PE: 150
PE: 150
L1: 2×120
U: 2×120
+: 2×150
L2: 2×120
V: 2×120
N: 2×150
L3: 2×120
W: 2×120
GND:16
-: 2×150
N: 2×120
N: 2×120
PE: 150
PE: 120
PE: 120
L1: 2×95
U: 2×95
+: 2×120
L2: 2×95
V: 2×95
N: 2×120
L3: 2×95
W: 2×95
GND: 16
-: 2×120
N: 2×95
N: 2×95
PE: 120
PE: 95
PE: 95
L1: 2×70
U: 2×70
+: 2×95
L2: 2×70
V: 2×70
N: 2×95
L3: 2×70
W: 2×70
GND: 16
-: 2×95
N: 2×70
N: 2×70
PE: 95
PE: 70
PE: 70
U: 70
L1: 70
+: 95
V: 70
L2: 70
N: 95
L3: 70
W: 70
GND: 16
–: 95
N: 70
N: 70
PE: 50
PE: 35
PE: 35
L1: 25
U: 25
+: 35
L2: 25
V: 25
N: 35
L3: 25
W: 25
GND: 16
–: 35
N: 25
N: 25
PE: 35
PE: 25
PE: 25
1
Installing a Cabinet
Secured Installation
1
Determine the UPS cabinet installation position. Draw mounting holes in the
installation position according to the drawing.
Unit: mm
2
Drill holes in the mounting holes using a hammer drill, and install expansion bolts
in the holes.
M12 bolt
Spring washer
Flat washer
Concrete floor
Expansion sleeve
Expansion nut
3
Move the cabinet to the installation position. Remove the rear panel of the
cabinet, and then open the front door.

Advertisement

loading
Need help?

Need help?

Do you have a question about the UPS5000-E-300K-SM and is the answer not in the manual?

Questions and answers

Summary of Contents for Huawei UPS5000-E-300K-SM

  • Page 1 400 A/3P Date: 2025-01-15 M12 bolt 150 kVA 320 A/3P 250 A/3P 250 A/3P Copyright © Huawei Digital Power Technologies Co., Ltd. 2025. All rights reserved. Spring washer Flat washer 100 kVA 250 A/3P 160 A/3P 160 A/3P Installation Preparation...
  • Page 2 Remove the four plugs from the bottom of the cabinet (two at the front and two Installing Cables • Drill holes into the large cover for routing cables. at the rear). Remove all small covers from the bottom of the cabinet. Remove the two large covers from the top of the cabinet, drill holes into them, and install them to the positions where the small covers were placed.
  • Page 3 Install output cables. Bolt Install AC input cables. Connector Connection Method Bolt Length Torque Specifications One power source Mains input Crimped OT terminals 45 mm 46 N·m Bypass input Crimped OT terminals 45 mm 46 N·m Battery input Crimped OT terminals 45 mm 46 N·m Output...
  • Page 4 Network port on Modbus-TCP the upper-level Desiccant or SNMP management system Huawei Digital Power Technologies Co., Ltd. Mains Third-party RS485 port on + – Huawei Digital Power Antuoshan Headquarters, Futian District, Shenzhen Modbus- the upper-level RS485 Battery management 518043 system www.huawei.com...