Mounting; Rack Mounting - TP-Link TL-SL5428 Installation Manual

24-port 10/100 + 4-port gigabit managed switch
Hide thumbs Also See for TL-SL5428:
Table of Contents

Advertisement

I
NSTALLING THE

Mounting

This switch can be mounted in a standard 19-inch equipment rack or on a
desktop or shelf. Mounting instructions for each type of site follow.

Rack Mounting

Before rack mounting the switch, pay particular attention to the following
factors:
Temperature: Since the temperature within a rack assembly may be
higher than the ambient room temperature, check that the
rack-environment temperature is within the specified operating
temperature range 0 °C to 40 °C.
Mechanical Loading: Do not place any equipment on top of a
rack-mounted unit.
Circuit Overloading: Be sure that the supply circuit to the rack
assembly is not overloaded.
Grounding: Rack-mounted equipment should be properly grounded.
Particular attention should be given to supply connections other than
direct connections to the mains.
3-4
S
WITCH

Advertisement

Table of Contents
loading

Table of Contents