Installing The Switch; Selecting A Site - TP-Link TL-SL5428 Installation Manual

24-port 10/100 + 4-port gigabit managed switch
Hide thumbs Also See for TL-SL5428:
Table of Contents

Advertisement

I

Selecting a Site

Switch units can be mounted in a standard 19-inch equipment rack or on a
flat surface. Be sure to follow the guidelines below when choosing a
location.
The site should:
-
be at the center of all the devices you want to link and near a
power outlet.
-
be able to maintain its temperature within 0 to 40 °C (32 to
104 °F) and its humidity within 10% to 90%, non-condensing
-
provide adequate space (approximately two inches) on all sides for
proper air flow
-
be accessible for installing, cabling and maintaining the devices
-
allow the status LEDs to be clearly visible
Make sure twisted-pair cable is always routed away from power lines,
fluorescent lighting fixtures and other sources of electrical
interference, such as radios and transmitters.
Make sure that the unit is connected to a separate grounded power
outlet that provides 100 to 240 VAC, 50 to 60 Hz, is within 2.44 m
(8 feet) of each device and is powered from an independent circuit
breaker. As with any equipment, using a filter or surge suppressor is
recommended.
NSTALLING THE
C
HAPTER
S
WITCH
3
3-1

Advertisement

Table of Contents
loading

Table of Contents