Operating Manual
BYD COMMERCIAL STORAGE SOLUTION
Battery-Max Lite
ENGLISH
Version 1.0

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Battery-Max Lite 90 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Installation
5.1. Requirements for Installation Environment
Specifies environmental conditions, location, and site requirements for safe and effective installation.
5.4. Hoisting and Transport
Provides safety precautions and methods for lifting and transporting the battery system.
5.6. Safety Gear
Specifies essential personal protective equipment (PPE) to be worn during installation.
5.8. Fixed Installation
Describes the steps and methods for securely fixing the battery cabinet to the installation site.
5.12. Installing the Battery Modules
Guides through the process of safely unpacking and installing the battery modules.
Electrical Connection
6.1. Precautions
Outlines critical safety precautions related to electrical connections to prevent hazards.
6.3. Connecting a Ground Cable for the Cabinet
Provides instructions for correctly connecting the ground cable to the cabinet for safety.
6.4. Battery Module and PDU Wiring
Covers the wiring procedures for battery modules and the Power Distribution Unit (PDU).
6.6. Parallel Communication Connection between Cabinet
Details how to establish communication connections between multiple cabinets in parallel.
Commissioning
7.1. Switch On the Battery System
Step-by-step guide to safely power on and initialize the battery system.
7.2. Configuration
Instructions for configuring the battery system using the BYD Max Lite application.
7.3. Switch On and Commission the Inverter
Guides on how to switch on and commission the connected inverter.
Operation
8.1. Switch On the Battery System
Procedure for starting up the battery system in conjunction with the inverter.
8.2. Switch Off the Battery System
Procedure for safely shutting down the battery system.
8.5. Air Conditioning Working Strategy
Describes the operational logic for the internal air conditioning system.
Maintenance and Storage
12.2. Storage
Details proper procedures and conditions for storing the battery system.
12.3. Maintenance
Covers general maintenance procedures and precautions.
Appendix 1 Connection Options with Inverters
1. Deye SUN-50K-SG01HP3-EU-BM4 Option a
Details the CAN port connection for Deye SUN-50K-SG01HP3-EU-BM4 Option a.
2. Deye SUN-50K-SG01HP3-EU-BM4 Option b
Details the CAN port connection for Deye SUN-50K-SG01HP3-EU-BM4 Option b.
3. Solis S6-EH3P-50K-H Option a
Details the CAN port connection for Solis S6-EH3P-50K-H Option a.
4. Solis S6-EH3P-50K-H Option b
Details the CAN port connection for Solis S6-EH3P-50K-H Option b.
5. SMA Sunny Tripower Storage X 50
Details the ETH/RS485/CAN connection for SMA Sunny Tripower Storage X 50.
6. Kaco blueplanet gridsave 92.0 TL3-S
Details the CAN/RS485/ETH connection for Kaco blueplanet gridsave 92.0 TL3-S.