GUIL ELC-750 User Manual

Telescopic lifting towers

Advertisement

Quick Links

USER MANUAL
EN
Telescopic lifting towers
ELC-740
ELC-750
ELC-760/M
 INGENIERÍA PARA EL ESPECTÁCULO  ENGINEERING FOR THE ENTERTAINMENT INDUSTRY

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ELC-750 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Operating Instructions
Tower Set-Up
Step-by-step guide for positioning and securing the lifting tower at the work site.
Function Test for Lifting Tower
Procedures to verify the winch, cable, and telescopic sections function correctly before use.
Risk Assessment
Pre-Operation Inspection Risks
Identifies risks during pre-operation checks and suggests corrective actions for tower safety.
Lifter Set-Up Risks
Assesses risks related to setting up the lifter and provides solutions for safe installation.
Using the Lifter Risks
Evaluates risks during lifting operations and offers mitigation strategies for safe use.
Tower Maintenance Risks
Identifies maintenance-related risks and their corrective measures for the tower.
Tower Transportation Risks
Assesses risks during transportation and provides solutions for safe movement of the tower.

Table of Contents