Assistance Estimated assembly If you require assistence, or need to order replacement time: 8 hours. parts, contact your Visscher Dealer. For additional information call the number below. Please have the serial number ready to ensure quick service. TOLL FREE 1 (877) 795-7423 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 4
R U B B E R M A L L E T C H A L K L I N E M A R K E R T R I GG ER CLA M P ( X2) Required Required OR A FLOOR MARKING TAPE 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 5
TO R X T 2 5 B IT 264X 136X 2 1 / 2 " #8 F L AT HEAD ( # 2 RO BERTSO N ) TO R X T 3 0 B IT MEASUREMENTS ARE APPROXIMATE 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 7
4037 Lower Roof Strapping 4044 Panel Support Left 2193 Hip Cover 4125 Peak Support Block 4045 Panel Support Right 14 5/8” 7220 Hip Cap 4040 Mid Roof Strapping 4042 Upper Roof Strapping MEASUREMENTS ARE APPROXIMATE 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 9
Components Single Door 4094 Strike Plate Handle parts for the Single Door can be found in the Handle packaging provided. 2386 Handle 2569 Latch 3 Keys Set Deadbolt 4090 Single Door MEASUREMENTS ARE APPROXIMATE 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 10
Phases Follow the sequence of phases, as shown: Panels Roofing Roofing Structure Roofing Single Door Roofing Structure Single Door Panels 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 11
Position of the Screens and Soft Windows can be easily reversed to your preference. Door direction can be reversed. CAUTION: Do not over sink Panel Screws. Shear panel Shear panel Soft Window Soft Window panel panel 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 12
2 1 /2 " #8 FL AT H E AD ( #2 RO BERTSON ) 4033 Split Truss Frame 4033 Split Truss Frame Member Member 4031 Split Truss Frame Sub-Assembly The components should be fit as tightly together as possible 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 13
Truss Frame Assembly must be square Measure the Truss Frame to verify squareness. Adjust the Truss Frame until both measure- ments are equal. A to D = B to C The components should be fit as tightly together as possible 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 14
3) Once markings are complete, move the Truss Frame Assembly up and out of the way. These markings will be helpful in placing your corner posts and panels in the steps to come. Chalk Line Marker 120” 120” 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 15
The film on the panel is meant to reduce any chance of scratches or scuffs. It is not meant to be left on and will be extremely difficult to remove if left in the sun. 3544 Shear Panel 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 16
Bay Kit at this time. Bay kit The Bay Kit is the ultimate add-on to a VISSCHER fully enclosed structure. Not only does it instantly add square footage to the interior, but the bay also adds a stylish look that will set your enclosure apart from the neighbourhood.
2 1/2" #8 WASHER HEAD (#2 ROBERTSON) 5125 Post 3544 Shear Panel 3544 Shear Panel Top view Screws should be in middle 1880 Foam Gasket Do not over sink the screws 5125 Post 3544 Shear Panel 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 19
KN I FE 5125 Post knife 1880 Foam Gasket Do not over sink the screws Top view 5125 Post 3544 Shear Panel 3507 Soft Window Panel 5125 Post 3507 Soft Window Panel 3544 Shear Panel 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 20
Foam Gasket 3507 Soft Window Panel 3507 Soft Window Panel TR IGGER CLAM P ( X2 ) Top view Trigger clamp 1880 Foam Gasket Do not over sink the screws Screw from Shear panel when possible. 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 21
2 1/2" #8 WASHER HEAD (#2 ROBERTSON) 3507 Soft Window Panel T RI GGER CLAM P (X 2 ) 3507 Soft Window Panel 1880 Foam Gasket Trigger clamp 3507 Soft Window Panel Top view 3507 Soft Window Panel Fastened from inside 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Soft Window Panel Top view of the front right corner Panels 3507 Soft Window Panel 3544 Shear Panel Screws should be in middle 3544 Shear Panel 3507 Soft Window Panel 1880 Foam Gasket 5125 Post 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 23
2) Fasten the Panels Assembly to the structure. Wall Panels are to be flush at top and bottom. If necessary, use Trigger Clamps to assist wall assembly. 1880 Foam Gasket Trigger clamp 2 1/2" #8 WASHER HEAD (#2 ROBERTSON) Top view Panels Assembly Fastened from inside Panels Assembly 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 24
2 1/2" #8 WASHER HEAD (#2 ROBERTSON) 1880 Foam Gasket Outside view 5125 Post 3507 Soft Window Panel Top view of the front left corner Panels 3507 Soft Window Panel 3507 Soft Window Panel 3507 Soft Window Panel 5125 Post 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 25
2) Fasten the Panels Assembly to the structure. Wall Panels are to be flush at top and bottom. If necessary, use Trigger Clamps to assist wall assembly. 1880 Foam Gasket Trigger clamp 2 1/2" #8 WASHER HEAD (#2 ROBERTSON) Top view Panels Assembly Fastened from inside Panels Assembly 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 26
4092 Hinged Post Hinged Post to the other side, so the door hinges be fasten on the left side of the door frame. Flush 4091 Strike Post Riser Flush 4092 Hinged Post Flush 4093 Threshold 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 27
2) Fit the Door Frame Assembly and fasten through the panels. Riser must be oriented to the ground. 1880 Foam Gasket Trigger clamp 3 1 /8 " X 5 /1 6 " RS S (T3 0 TORX ) Fastened from inside Door Frame Assembly 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 28
1) Fasten the Truss Frame Assembly to the structure from inside. Use two screws per Panel. 2 1/2" #8 WASHER HEAD (#2 ROBERTSON) Truss Frame Assembly Inside view Use two screws per Panel Fastened from inside 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 29
Step 17 1) Fasten the Truss Frame Assembly to the Posts 5125) in the pre-drilled holes. 4" X 5/ 16 " RSS ( T3 0 TORX ) Truss Frame Assembly 5125 Post 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 30
The windows can be installed from the inside or outside of the structure. 4102 Folding Soft Window *The Soft Windows and Screens can be installed at the end of the installation. 4102 Folding Soft Window 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 32
2 3 /4 " #1 0 RS S (T2 5 TORX) 4125 Peak Support Block 4097 Ridge Beam Bracket 4125 Peak Support Block Top view Please, ensure side with the Serial Number is facing down 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
1) Attach Common Rafters 4036) to the Ridge Beam Assembly as shown in diagram. 106X 4036 Common Rafter 2 3 /4 " #1 0 RS S (T2 5 TORX) Side view 4036 Common Rafter Top view 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 34
1) Flip the Rafter Assembly over and place on Truss Frame. 2) Square the Rafters to the Truss Frame. Do not fasten rafters to Truss Frame at this time. Do not fasten at this time. Rafter Assembly Square the Rafters to the Truss Frame 90° 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 35
106X 2 3 /4 " #1 0 RS S (T2 5 TORX) 4035 Hip Rafter 4035 Hip Rafter 4035 Hip Rafter Do not fasten Rafters 4035 Hip Rafter to the Truss Frame at this time. 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 36
2 1 / 2 " # 8 F L AT H E A D ( # 2 R O B ERTS O N ) 4045 Panel Support Right Top view 4045 PS Right 4044 PS Left 4044 PS Left 4045 PS Right 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 37
Step 24 1) Fasten the Common and Hip Rafters to the Truss Frame. 106X 2 3 /4 " #1 0 RS S (T2 5 TORX) 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 38
264X 2 1 / 2 " # 8 F L AT H E A D ( # 2 R O B ERTS O N ) 4042 Upper Roof Strapping 4042 Upper Roof Strapping Top view 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 39
2 1 / 2 " # 8 F L AT H E A D ( # 2 R O B ERTS O N ) 4040 Mid Roof Strapping Top view Screws at Hip Rafters must enter on an angle. 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 40
2 1 / 2 " # 8 F L AT H E A D ( # 2 R O B ERTS O N ) Do not stand on the Truss Frame or Rafter Assembly 4037 Lower Roof Strapping Top view Screws at Hip Rafters must enter on an angle. 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 41
1 1 /2 " # 8 F L AT H E A D 4104 Metal Corner Cover ( # 2 R O B ERTS O N ) 4104 Metal Corner Cover Align with end of Rafter Top view Centered on Rafter 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 42
2) Fasten the Hip Covers to the Strappings and Panel Supports. 1 1 /2 " # 8 F L AT H E A D 2193 Hip Cover ( # 2 R O B ERTS O N ) 2193 Hip Cover Flush 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 43
Bay Kit at this time. Bay kit The Bay Kit is the ultimate add-on to a VISSCHER fully enclosed structure. Not only does it instantly add square footage to the interior, but the bay also adds a stylish look that will set your enclosure apart from the neighbourhood.
Page 44
Phase C Roofing Only put screws at pre-punched locations. When stepping on Roof, step on Screw Line and avoid stepping on Ribs as they can dent and deform. 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Bottom view 11’ side No need for Foam Closure on the rib that will overlap another rib. 7032 RS (Outside right) 7031 RS (Inside right) 7030 RS (Inside left) 7029 RS (Outside left) 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 46
Step 31 1) Attach the Roof Installation Tools 7063) at the positions shown. 7063 Roof Installation Tool 7063 Roof Installation Tool Top view 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Front view Overlap 7030 RS (Inside left) 7031 RS (Inside right) Fasten two screws Top view per Roof Sheet. Resting evenly Only fasten the on Hip Rafters middle line of screws. 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
1 " #9 H E X H E AD Roof Sheet To take off the Installation Side view tool, press it upwards with your fingers. 2823 Foam Closure Detail view Do not fasten these two screws yet. 7031 RS (Inside right) 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 49
7029 Roof Sheet 234X 4) Fasten remaining screws for this section. (Outside right) (Outside left) 1 " #9 H EX H E AD Front view 7029 RS (Outside left) 7032 RS (Outside right) Underlap Overlap 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 50
Roof. Only put screws at pre-punched locations. When stepping on Roof, step on Screw Line and avoid stepping on Ribs as they can dent and deform. Resting evenly on Hip Rafters 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 51
Step 36 KN I FE 1) Attach the top Foam Closure 2822) in all sides. Use knife to cut exceeding parts. knife 2822 Top Foam Closure 2822 Top Foam Closure 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 52
2) Apply pressure to adhere the Tape to the contour of the Roofing sheets. 3) Once adhered fully, trim at edge of the Roofing sheet as shown. 4) Repeat this on all four sides. knife 2033 Sealing Tape The Sealing tape must be centered on the joint. 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 53
3) Repeat the process for all four sides. Do not over-tighten screws. 185X 3/ 4 " #1 4 H EX 7220 Hip Cap 7220 Hip Cap Top view Screws must be fastened through the top ribs of the Roofing sheet only. 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 54
3) Secure the Peak Cap with screws on each side through the Cap and into the Roofing. 234X 7209 Peak Cap 1 " #9 H EX H E AD Top view 7209 Peak Cap Screws must be fastened through the top ribs of the Roofing sheet only. 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 55
Bay Kit at this time. Bay kit The Bay Kit is the ultimate add-on to a VISSCHER fully enclosed structure. Not only does it instantly add square footage to the interior, but the bay also adds a stylish look that will set your enclosure apart from the neighbourhood.
Page 56
Phase D Single Door Use the Door Handle instruction manual provided to install the handle, deadbolt and lock. 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 57
1 1 /2 " #8 F L AT H EAD 4094 Strike Plate (#2 ROB ERTSON ) Fasten only in the bottom and top holes 4094 Strike Plate at this time. Flush the Strike Plate to the reference line indicated. 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 58
(#2 ROB ERTSON ) 4090 Single Door For proper door function the screws must be inserted in pre-punched holes on the door frame. Black Plastic Shim 4090 Single Door Black Plastic Shim 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 59
4) Remove Key from assembly. Refer to the instruction manual provided with the handle for more information regarding installation. Orientate flat surfaces. Turn key 180 ° in the Remove Key from counter-clockwise assembly. direction. Flat surfaces 180 ° 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 60
Spindle. Fasten the Latch with the screws provided. Outside Inside Refer to the instruction manual Handle assembly provided with the handle for more information regarding installation. Square spindle Latch Key cylinder Flat spindle Deadlock Clip 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 61
3) Once you find the correct position, fasten the Strike Plate in the pre-punched hole. 1 1 /2 " #8 F L AT H EAD (#2 ROB ERTSON ) Latch Strike Plate Deadlock Strike Plate 0525 Hudson-Adela-Minto 11x11 Instructions V1.0...
Page 62
I N STAL L AT IO N CO M PLE T E You can upgrade your Visscher gazebo by adding optional accessories. If you wish to purchase optional Bay Kit accessories, please contact your local Visscher dealer. Cedar Panels...
Need help?
Do you have a question about the ADELA and is the answer not in the manual?
Questions and answers