Customizing The Project Panel; To Add A Column; Chapter 6: Managing And Viewing Assets - Adobe PREMIERE PRO 2 Manual

Table of Contents

Advertisement

Chapter 6: Managing and viewing assets

Customizing the Project panel

To change Project panel views
After you obtain an asset, its name appears in the Project panel. The Project panel lists detailed information about
each asset in your project. You can view and sort assets in either List view or Icon view. List view displays additional
information about each asset. You can customize the information it displays to meet the needs of your project.
A
Project panel views
A. List view B. Icon view
To change from one view to another, click the List View
the panel, or choose View > List or View > Icon from the Project panel menu.
To arrange items in Icon view, drag an item to any square. As you drag, a vertical bar indicates where the item is
going. If you drag an item to a bin, the item goes inside the bin.
You can use Icon view for storyboarding and then use the Automate To Sequence feature to move the storyboard into
a sequence.
To sort items in List view, click the column heading by which you want to sort the items. If bins are expanded,
items sort from the top level and down the Project panel hierarchy. To reverse the sort order, click the column
heading again.
To hide or show the thumbnail viewer and clip information, choose View > Preview Area from the Project panel
menu.
To hide or set the size of thumbnails, choose Thumbnails from the Project panel menu.
To remove empty space between items in Icon view and arrange them within the width of the Project panel, choose
Clean Up from the Project panel menu.

To add a column

1
Choose Edit Columns from the Project panel menu.
B
button or the Icon View
button at the bottom of
92

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Premiere pro 2.0

Table of Contents