(Optional field) The initialization data that the SCO expects from the LMS. Because a SWF file cannot
Launch Data
be modified based on the initialization data, this option can be left blank for Adobe Captivate projects.
Click OK to return to the Preferences dialog box.
10
Select an LMS from the menu. If the LMS to which you are connecting is not listed in the menu, select Default.
11
Select the condition for the report status. The report status is sent after every user attempt to the LMS.
12
The report status is sent as complete or incomplete depending on the options set in the
Complete/Incomplete
Choose Report Data section.
The report status is sent as pass or fail depending on the options set in the Choose Report Data section.
Pass/Fail
Select an option in Choose Report Data. The report status is set depending on the options you choose.
13
Adobe Acrobat Connect Pro
The status is sent as Fail/Incomplete after every user interaction until the user achieves the
Quiz Results Only
minimum score required to pass the exam. From then on, the status is reported as Pass/Complete to the LMS.
Quiz Results And Slide Views
score and has viewed the prescribed number of slides.
The status is sent as Pass/Complete even if a single user interaction occurs.
User Access Only
The status is sent as Pass/Complete only after the user has completed viewing the prescribed
Slide Views Only
number of slides.
You can choose to send the score to the LMS in points or as a percentage. Choose the Percent option because of its
14
better compliance with LMS.
You can choose to send information on the interaction and the final score or just the final score. The entire course
15
of user interaction until the end of the project is tracked if you choose Interaction And Score.
16
Click LMS Customization Settings, and select options in the LMS Customization Settings dialog box:
Never Send Resume Data
the page at which they left off earlier. If this option is enabled, users see the first page when they resume the project.
Escape Version and Session ID
Supports the escape version and session ID option. Type the characters that should not be
Don't Escape Characters
included in the escape version and session ID.
Click OK.
17
The manifest file is generated. To see the manifest file, publish your Adobe Captivate project and create a SWF file.
If you used the default save location, you see the SWF file and imsmanifest.xml file in your My Documents\My
Adobe Captivate 5 Projects folder (on Windows) /Users/<username>/Documents/My Adobe Captivate Projects
folder (on Mac OS).
Note: If necessary, you can create a package interchange file (PIF). The PIF packages the Adobe Captivate project
output files and manifest file (with additional files if you are using the SCORM 2004 option).
Publish the project for an LMS
After you set the SCORM/AICC options, you must publish the project as an SWF file.
DRAFT
The report is generated in the Adobe Acrobat Connect Pro format.
The status is sent as Pass/Complete only after the user has achieved the minimum
The project notifies the LMS when users resume a session after taking a break. Users see
Converts the version and session ID to its URL encoded values.