Porsche 928 - WORKSHOP MANUAL 1977 Workshop Manual page 438

Table of Contents

Advertisement

87
Air
Conditioner
928
CHECKING OPERATING SWITCH
Note:
With operating
switch
removed and
all
connections
made, use a volt-
meter
to test
voltages
at the 15-
pole
plug.
l.Switch
on ignition.
2.Connect
voltmeter
to terminal
1
(plus)
and terminal
4 (minus).
Air-distribution
slide
at bottom
and bottom/top.
Reading:
Battery
voltage.
3.Connect
voltmeter
to terminal
2
and terminal
4.
Air-distribution
slide
at off,
center
and bottom..
Reading:
Battery
voltage
4.Connect
voltmeter
to terminal
3
and terminal
4.
Switch
on position
lights.
Reading:
Battery
voltage.
5.Connect
voltmeter
to terminal
5
and terminal
4.
Air-distribution
slide
at centre,
bottom,
bottom/top,
top and
defrost.
Reading:
Battery
voltage.
If
no voltage
is registered,
check
whether
fresh-air
blower
relay
switches.
If
the fresh-air
blower
relay
does not switch,
test
the
signal
at terminal
86. Connect
voltmeter
to terminal
15 and ter-
minal
4 of operating
switch.
Air-distribution
slide
at the same
positions.
Reading:
Battery
voltage.
6.Connect
voltmeter
to terminal
7
and terminal
4.
Air-distribution
slide
at center,
bottom,
bottom/top
and defrost.
Switch
on auxiliary
air
conditioner.
Reading:
Battery
voltage
If
no voltage
is registered,
check air-conditioner
switch.
7.Connect
voltmeter
to terminal
6
and terminal
4.
Air-distribution
slide
at center,
bottom,
bottom/top
and top.
Switch
on auxiliary
air
conditioner.
Reading:
Battery
voltage.
a
87 - 110
Checking
Operating
Switch
Printed
in Germany

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1986 9281985 928928

Table of Contents