Average Response Time Per Measured Day - IBM PERFORMANCE MANAGEMENT FOR POWER SYSTEMS - GRAPH REFERENCE DOCUMENT 10-2010 Reference

Graph reference document
Table of Contents

Advertisement

Average Response Time per Measured Day

Daily Local Terminals Average Response Time Graph.
The Average Response Time per Measured Day graph for local terminals shows the response
time of the system for local terminal users (traditional displays) attached with twinax cables.
This includes all the 5250-type terminals and those that emulate 5250 devices (for example, PCs
with twinax cards).
PM for Power Systems Graph Reference Document
81

Advertisement

Table of Contents
loading

This manual is also suitable for:

Performance management for power systems

Table of Contents