Guidelines For Total Processor Utilization - IBM PERFORMANCE MANAGEMENT FOR POWER SYSTEMS - GRAPH REFERENCE DOCUMENT 10-2010 Reference

Graph reference document
Table of Contents

Advertisement

Guidelines for Total Processor Utilization

These are shown in the 'FACTS' at the bottom of most graph pages.
These are the processor utilization guidelines that are used to determine if a resource is 'OK',
'marginal', or 'critical'. They are based on the number of processors that are configured for the
server/LPAR.
'Average' by definition indicates the average utilization for all hours in the shift for the measured
days in the period.
'Peak' average indicates an average of the two busiest hours during the shift for the measured
days in the period.
If a measurement exceeds the marginal percentage in the table, then the particular resource
being measured should be given attention in the near future.
If a measurement exceeds the critical percentage, then immediate attention should be given to
the system resource being measured.
22
PM for Power Systems Graph Reference Document

Advertisement

Table of Contents
loading

This manual is also suitable for:

Performance management for power systems

Table of Contents