Advertisement

2020-07-21
EN
0000000061
V.022
1513
93003-003
PelletsUnit
7 - 15 kW
Installation

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PU15 and is the answer not in the manual?

Questions and answers

Summarization of Contents

General Information
Preface
Brief introductory statement about the manual's purpose.
General Information Overview
Covers copyright, technical changes, and explanation of symbols used.
Warranty and Guarantee
Details warranty conditions, extended warranty options, and service agreements.
Dismantling and Disposal
Procedures for safe and environmentally friendly end-of-life handling of the boiler.
Technical Data and Energy Labelling
Product Dimensions and Connections
Visual representation of physical specifications and external connection points.
Pellets Unit Specifications
Key performance and operational data including capacity, efficiency, and emissions.
Energy Efficiency Classifications
Details energy efficiency classifications for the boiler and package system.
Regulations, Standards, and CE Conformity
National Regulations and Standards
Lists relevant country-specific building, fire safety, and technical standards.
CE Declaration of Conformity
Formal statement of product compliance with EU directives and applied standards.
Boiler Room and Safety Requirements
Boiler Room Installation Requirements
Specific construction, fire resistance, and ventilation needs for the installation space.
Fuel Storage Regulations
Rules and recommendations for storing pellets safely within or near the boiler room.
General Safety Information
Operational safety rules for users and personnel, including fire safety.
Safety Devices and Overpressure Protection
Explanation of protective mechanisms like safety valves and temperature limiters.
Installation Guidance
Chimney Installation and Renovation
Requirements for chimney diameter, layout, and renovation for optimal performance.
Water Hardness and Corrosion Prevention
Critical system health factors and methods to prevent corrosion and scaling.
Bleeding, Pressure Equalisation, and Noise Control
System maintenance procedures for bleeding, pressure management, and noise reduction.
Critical Installation Safety Warnings
Warnings against incorrect chimney connections and tampering with safety devices.
External Air Supply Operation
External Air Supply Requirements
Compatibility and setup for boilers operating with external air intake.
Air Supply Ducting and Length Limits
Insulation, fire protection, and length specifications for air supply ducts.
Buffer Storage Tank Integration
When a Buffer Tank is Necessary
Criteria determining the need for a buffer tank in heating systems.
Hydraulic Integration of a Buffer Tank
Instructions for correctly connecting the buffer tank to the heating system.
Core Installation Procedures
Qualified Personnel and Boiler Placement
Requirement for professional installation and guidance on boiler positioning.
Accessing Internals and Connecting Piping
Steps for removing panels and connecting various plumbing lines.
Conversion for Buffer Operation
Steps to reconfigure the boiler for operation with a buffer tank.
Attaching Pellet Hoses
Connecting fuel supply hoses to the boiler and ensuring proper earthing.
Electrical Connections and Circuit Boards
Qualified Electrician and Safety
Mandate for professional electricians and essential electrical safety precautions.
Circuit Board Overview and Terminals
Identification of main circuit boards and details of their terminals and functions.
Pellet Store Management
Pellet Store Placement, Size, and Structure
Location considerations, structural requirements, and sizing calculations for fuel storage.
Filling Nozzles, Hoses, and Tilted Floor
Installation of delivery points, hose specifications, and tilted floor design for extraction.
Fire Safety Regulations and Ventilation
Compliance requirements and air exchange needs for pellet storage areas.

Table of Contents