3 Pre-Commissioning
Pre-Commissioning Preparation and On-Site Checks
Covers pre-site tasks, form prerequisites, and initial on-site checks like cabling.
4 System Configuration and Setting Thresholds
4.1 IFT Detector Configuration
Configuring IFT detectors via menus, access codes, and programmable functions.
4.2 ILS Detector Configuration
Configuring ILS detectors through user interface or software, including programmable functions.
4.3 IAS Detector Configuration
Configuring IAS detectors, highlighting system differences and programmable functions.
5 System Integrity Test
5.1 Performance-based Smoke Testing
Methods for testing pipe integrity and response, including various smoke tests and stratification issues.
5.2 Testing Devices
Procedures for testing IFT detector outputs using diagnostic tests.
5.3 Documenting Test Results
Process for recording and forwarding test results on commissioning forms.