Wallbox Master Installation Manual

Wallbox Master Installation Manual

Power sharing smart

Advertisement

INSTALLATION GUIDE
POWER SHARING SMART
EN - V2.0

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Master and is the answer not in the manual?

Questions and answers

Summarization of Contents

2. Installation
2.1 Positioning in the System (T/NT-Chargers)
Defines the placement of Terminating (T) and Non-Terminating (NT) chargers in a Power Sharing system.
2.2 CAN Cabling (CAN-H/-L)
Details the communication cabling between chargers using CAN-H and CAN-L connections.
2.4 Installation: Cabling (Commander/ Pulsar)
Explains CAN cabling for Commander and Pulsar chargers.
3. Configuration
3.1 Master and Slave setup and Powering On
Configures chargers as Master or Slave and details the powering on sequence.
3.2 Master Configuration
Details the parameters for configuring the Master charger in the Power Sharing system.
4. Operation
4.1 Status Visualisation
Explains how to interpret the status indicators for chargers in the Power Sharing system.
5. Troubleshooting
5.1 Troubleshooting
Addresses common issues like red/green LEDs and 'Slave not paired' messages.

Table of Contents