Avaya S8300D Replacement Manual

Avaya S8300D Replacement Manual

Job aids for field replacements (frus) with the g700 media gateway
Table of Contents

Advertisement

Job Aids for Field Replacements
(FRUs) for the Avaya S8300 Server
with the G700 Media Gateway
03-300528
Issue 6
May 2009

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the S8300D and is the answer not in the manual?

Questions and answers

Summarization of Contents

Job Aid: Replacing the S8300 Server or its Hard Drive
Assumptions for S8300 Server Replacement
Assumptions for the successful completion of the S8300 server replacement procedure.
Site Preparation for S8300 Replacement
Steps to prepare before going to the customer site for S8300 replacement.
S8300 Hardware Replacement Procedure
Step-by-step guide for replacing the S8300 server or its hard drive.
Post-Replacement Configuration
Configuring server date, time, software, and RAM disk settings after replacement.
Job Aid: Replacing the G700 Media Gateway
Assumptions for G700 Gateway Replacement
Assumptions for the successful completion of the G700 Media Gateway replacement.
Site Preparation for G700 Gateway Replacement
Steps to prepare before going to the customer site for G700 replacement.
G700 Gateway Hardware Replacement
Procedure for replacing the G700 Media Gateway hardware.
Job Aid: S8300 Communication Manager and Co-resident SES: Replacing the S8300C or S8300D Server or Hard Drive
Required Information and Materials
Information and materials needed for S8300C/D server or hard drive replacement.
Site Preparation for S8300C/D Replacement
Steps to prepare before going to the customer site for S8300C/D replacement.
S8300C/D Server or Hard Drive Replacement
Procedure for replacing the S8300C/D server or hard drive and installing software.
Post-Replacement Configuration and Verification
Configuring network, restoring data, and performing integrity checks post-replacement.
Job Aid: Replacing Media, Expansion, or Octaplane Modules
Replacing Media Modules
Procedure for replacing Avaya Media Modules in the G700 chassis.
Replacing Expansion Modules
Procedure for replacing Avaya Expansion Modules in the G700.
Replacing Octaplane Stacking Module
Procedure for inserting an Avaya Octaplane Stacking Sub-Module.
Job Aid: Replacing the USB Modem
Removing and Replacing the USB Modem
Procedure for removing the old USB modem and installing a new one.
Job Aid: Replacing the CompactFlash Reader and Card
Required Equipment and Reader Replacement
Required equipment and procedure for replacing the CompactFlash card reader.
Replacing the CompactFlash Card
Procedure for replacing the CompactFlash card and formatting it.
Job Aid: Supported CD/DVD-ROM Drives
Supported CD/DVD-ROM Drive Information
Information on Panasonic Digistor, TEAC, and Addonics CD/DVD-ROM drives.
Connecting CD/DVD-ROM Drives to the Server
Procedure for connecting supported CD/DVD-ROM drives to an S8300 Server.

Table of Contents