Download Print this page
Field Controls trio 2000 Installation And Operation Manual

Field Controls trio 2000 Installation And Operation Manual

Air purification system

Advertisement

HEALTHY HOME AIR PURIFICATION SYSTEM
MODELS:
TRIO 1200 & TRIO 2000
INSTALLATION AND OPERATION
Field Controls, 2630 Airport Road, Kinston, NC 28504
*(252)522-3031*
www.fi eldcontrols.com

Advertisement

loading
Need help?

Need help?

Do you have a question about the trio 2000 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Specifications
Model Trio 1200 Specifications
Details for the Trio 1200 model including capacity, power, fuse, application, airflow, and dimensions.
Model Trio 2000 Specifications
Details for the Trio 2000 model including capacity, power, fuse, application, airflow, and dimensions.
Operation
System Operation Principles
Explains how the Trio 1200/2000 purifies air using PCO, MERV13, and UVC technologies.
Recommended Fan Operation
Advises on continuous operation and thermostat settings for optimal air purification.
Air Cycles and Operational Cost
Details air cycles per hour and the monthly cost of continuous 24-hour operation.
Service and Maintenance
Filter and UV Lamp Replacement Schedule
Outlines the recommended intervals for changing the MERV13 filter and UVC germicidal lamps.
Changing the Particulate Removal Cartridge
Step-by-step guide on how to remove and replace the unit's filter cartridge.
Changing the UVC Germicidal Lamps
Instructions for safely unplugging, removing, and replacing the UVC germicidal lamps.
Tracking Service Intervals
Methods for monitoring filter and UV lamp replacement times using apps or stickers.
Installation
Typical Installation Methods
Describes vertical, horizontal, and in-duct mounting procedures for the air purification system.
Sealing and Attachment
Details on sealing seams, attaching the unit, and ensuring proper fit within enclosures.
Performance Data and Diagrams
Airflow and Resistance Data
Presents airflow resistance data for Trio 1200 and Trio 2000 at various CFM and MERV13 ratings.
Particle Size Efficiency Analysis
Graph showing the percentage reduction of particles across different micron sizes.
Contaminant Reduction Performance
Data on viral, bacteria, VOCs, and allergen removal efficiency after specific operating times.
Technical Information
Wiring Diagram
Electrical schematic illustrating the connections for the Trio 1200/2000 system's components.
Product Label Placement Guide
Instructions and diagrams for correctly positioning the product label based on airflow direction.
Parts List and Warranty
Replacement Parts List
Comprehensive list of available replacement parts including UVC lamps, filters, ballasts, and catalysts.
Warranty Information
Details on warranty coverage and where to find further information on Field Controls products.