Page 3
…………………………… - �� - 7. Zero-export function via energy meter �.� Multiple strings and parallel connection meters ……………………… - �� - �.� How to browse the load power of your PV grid-tieplant on monitoring platform? - �� - …………………………………………… - �� - 8.
Documents must be stored carefully and be available at all times. Contents may be periodically updated or revised due to product development. The information in this manual is subject to The latest manual can be acquired via service@deye.com.cn change without notice. 1. Introduction 1.1 Appearance Introduction...
1.2 Parts list Please check the following table, to see whether all the parts are included in the package: Mounting stainless steel screws M��� Grid-tied PV String Inverter Wall mounting bracket x � x �� x � DC+/DC- Plug connectors Stainless steel anti-collision DRM connector including metal terminal...
Page 6
1.4 Product handling requirements Lift the inverter out of the packing box and transport it to designated installation location. transport CAUTION: Improper handling may cause personal injury! · Arrange an appropriate number of personnel to carry the inverter according to its weight, and installation personnel should wear protective equipment such as anti-impact shoes and gloves.
2. Safety warnings and instructions Improper use may result in potential electric shock hazards or burns. This manual contains important instructions that should be followed during installation and maintenance. Please read these instructions carefully before use and keep them for future reference. 2.1 Safety signs Safety symbols used in this manual, which highlight potential safety risks and important safety information, are listed as follows:...
2.3 Notes for using The three phase string power inverter is designed and tested under related safety regula- tions. It can ensure the personal safety of the user. But as a electric device, it may cause shock or injury by incorrect operation. Please operate the unit under below requirements: �.
3.2 Status Indicator The inverter panel has � indicators, the left one is dc output indicators, green indicates normal DC input. Beside is the AC indicator, green indicating normal ac connection. Beside the AC indicator is the operating indicator, green indicating normal output. The right indicator is alarm.
Page 10
4. Product installation 4.1 Select installation location To select a location for the inverter, the following criteria should be considered: WARNING: Risk of fire Do not install the inverter in areas containing highly flammable materials or gases. ● Do not install the inverter in potentially explosive atmospheres. ●...
Page 11
Install on a wall or strong structure capable of bearing the weight. ● Install vertically with a maximum incline of +��°. If the mounted inverter is tilted to an ● angle greater than the maximum noted, heat dissipation can be inhibited, and may result in less than expected output power.
4.3 Installations Tools Installation tools can refer to the following recommended ones. Also, use other auxiliary tools on site. table �-� Tool specification Protective goggles Work gloves Work shoes Utlity Knife Slotted screwdriver Anti-dust mask Earplugs Cross screwdriver Percussion drill Pliers Marker Level...
Page 14
5. Electrical Connection 5.1 PV Module Selection: When selecting proper PV modules, please be sure to consider below parameters: �) Open circuit Voltage (Voc) of PV modules not exceeds max. PV array open circuit voltage of inverter. �) Open circuit Voltage (Voc) of PV modules should be higher than min. start voltage. �) The PV modules used to connected to this inverter shall be Class A rating certified according to lEC �����.
Page 15
Cross section(mm ) Cable type Range Recommended value Industry generic PV cable �.�-�.� �.�(��AWG) (model: PV�-F) (��-��AWG) Table �.� DC Cable Specifications The steps to assemble the DC connectors are listed as follows: a) Strip off the DC wire about �mm, disassemble the connector cap nut (see picture �.�). �mm �mm Pic �.�...
Page 16
Please use its own DC power connector from the inverter accessories. Do not interconnect the connectors of different manufacturers.Max. DC input current should be ��A. if exceeds, it may damage the inverter and it is not covered by Deye warranty. 5.3 AC terminal connection Recommend...
Page 17
AC wire installation method: �) Disconnect the AC side circuit breaker and prevent it from inadvertent reconnection. �) Loosen � screws on the front cover of the junction box by using the Cross screwdriver and remove the cover plate of the junction box. (as shown in picture �.�). �) Loosen screws on the bottom sealing plate by using the Cross screwdriver and remove the sealing plate.
Page 18
�) Screw the AC connection cover back to the shell and tighten all the screws to the waterproof protection connector(as shown in Pic �.��). Pic �.�� Tighten the AC junction box 5.3.1 Recommended current protector specifications Inverter Rated voltage Rated output power ( KW) Current protection device (...
Page 19
The installation of the shell ground wire is shown as Pic �.��. Pic �.�� The installation of the shell ground wire Recommend Wire Size � Model Torque value(max) Cable(mm) copper cable (mm ) SUN-120K-G01P3-EU-BM8 20.3Nm 0AWG 20.3Nm SUN-125K-G01P3-EU-BM8 0AWG SUN-130K-G01P3-EU-BM8 20.3Nm 0AWG SUN-135K-G01P3-EU-BM8 20.3Nm...
Page 20
Phone GPRS Router Web Server WIFI Pic �.�� Internet monitoring solution 5.5.1 Installation of datalogger When installing the WiFi stick, tear off the sealing strip on the inverter. Insert the datalogger into the interface and fix it with a screw. The configuration of the datalogger needs to be performed after various electrical connections have been completed and the inverter DC power on.
6. Start up and Shut off Ensure that the inverter meets the following conditions before starting the inverter, otherwise it may cause fire or damage to the inverter without quality assurance, at the same time the situation on our company does not undertake any responsibility. At the same time, to optimize the system configuration, it is recommended that the two inputs be connected to the same number of PV modules.
Page 22
6.3 Anti-PID Function(Optional) Inverter The Anti-PID module repairs the PID effect of the PV module at night.The PID module always runs when connected to AC. If maintenance is required and turn off the AC switch can disable the Anti-PID function. Warning: The PID functionality is automatic.When the DC bus voltage is below ��VDC, the PID module will create ���VDC between the PV and ground.No control and equipment are required.
Page 23
Max. ��A current directly. More usable models of DTSU��� series , please refer to Pic �.� - �.��. Suggest purchasing smart meters from authorized distributors of Deye or directly from Deye. When you are reading this, we believe that you have completed the connection according to the requirements of chapter �, if you have been running your inverter at this time, and you...
Page 24
1 2 3 4 5 6 7 8 Eastron (1,2,3,4) (5,6,7,8) B A G RS 485 RS ��� B RS ��� A Eastron SDM���-Modbus V� Pic �.� Eastron meter Inverter Solar Panel array AC Breaker RS ��� Male connector Home load VCC_�V ���_B N L�...
Page 25
1 2 3 4 5 6 7 8 Eastron (1,2,3,4) (5,6,7,8) B A G RS 485 RS ��� B RS ��� A Eastron SDM���-Modbus V� Pic �.� Eastron meter Inverter Solar Panel array AC Breaker RS ��� Male connector Home load VCC_�V ���_B N L�...
Page 28
Three-Phase Smart Meter (1,4,7,10) (3,6,9,10) RS 485 CHINT DTSU��� �(��)A Pic �.� CHINT meter Solar Panel array Inverter AC Breaker RS ��� Male connector Home load L� L� L� N VCC_�V ���_B RS ��� Female connector Three-Phase Smart Meter meter ���_A L�...
Page 29
Three-Phase Smart Meter (1,4,7,10) (3,6,9,10) RS 485 CHINT DTSU��� �(��)A Pic �.�� CHINT meter Solar Panel array Inverter AC Breaker RS ��� Male connector L� L� L� N Home load VCC_�V ���_B RS ��� Female connector Three-Phase Smart Meter meter ���_A L�...
Page 30
6 9 10 1314 16171921 Three-Phase Smart Meter 230/400V, 3~100A/40mA 50/60Hz 24 25 Phase A current =5.000A 13 14 16 17 19 21 RS485 CHINT DTSU��� Phase B current =5.001A �x���/���V �~���A/��mA Pic �.�� CHINT meter Phase C current =�.���A Solar Panel array Inverter AC Breaker...
Page 31
6 9 10 1314 16171921 Three-Phase Smart Meter 230/400V, 3~100A/40mA 50/60Hz 24 25 Phase A current =�.���A 13 14 16 17 19 21 RS485 CHINT DTSU��� Phase B current =�.���A �x���/���V �~���A/��mA Pic �.�� CHINT meter Phase C current =�.���A Solar Panel array Inverter AC Breaker...
Page 32
�. Press Enter button on the LCD panel in the main interface into the menu options, select [parameter setting] to enter setup submenu, and then select [run param], at this time please input the default password ���� through pressing the button [up down, enter], enter the operation parameter setting interface, shown as picture �.��.
7.1 Multiple strings and parallel connection meters This application is that when the string inverters work in parallel, there is only one power grid and one load, and only one meter can be connected to prevent reverse current, so only this many-to-one anti-reverse current connection can be connected.
Page 34
Name Description Range AVG: Average power of three phase is zero exported. AVG/MIN MIN: Phase with minimum load power is zero Exp_Mode exported, while the other two phase may be in purchase mode. CT ratio of power grid side meter when extern �-����...
Page 35
1 2 3 4 5 6 7 8 Eastron (1,2,3,4) (5,6,7,8) B A G RS 485 RS 485 B RS 485 A Eastron SDM���-Modbus V� Pic �.�� Eastron meter Master(Mst) Grid L� L� L� N RS485 � ���_B ���_A � L�...
Page 36
1 2 3 4 5 6 7 8 Eastron (1,2,3,4) (5,6,7,8) B A G RS 485 RS 485 B RS 485 A Eastron SDM���-Modbus V� Pic �.�� Eastron meter Master(Mst) Generator L� L� L� N RS485 � ���_B ���_A � L�...
Page 39
Three-Phase Smart Meter (1,4,7,10) (3,6,9,10) RS 485 CHINT DTSU��� �(��)A Pic �.�� CHINT meter AC Breaker Master(Mst) L� L� L� Solar Panel array AC Breaker Slave�(Slv�) L� L� L� Solar Panel array AC Breaker Slave�(Slv�) L� L� L� Solar Panel array AC Breaker load VCC_�V...
Page 40
Three-Phase Smart Meter (1,4,7,10) (3,6,9,10) RS 485 CHINT DTSU��� �(��)A Pic �.�� CHINT meter Master(Mst) AC Breaker L� L� L� Solar Panel array AC Breaker Slave�(Slv�) L� L� L� Solar Panel array AC Breaker Slave�(Slv�) L� L� L� Solar Panel array AC Breaker load VCC_�V...
Page 41
6 9 10 1314 16171921 Three-Phase Smart Meter 230/400V, 3~100A/40mA 50/60Hz 24 25 Phase A current =5.000A 13 14 16 17 19 21 RS485 CHINT DTSU��� Phase B current =5.001A �x���/���V �~���A/��mA Pic �.�� CHINT meter Phase C current =5.002A Master(Mst) AC Breaker L�...
Page 42
6 9 10 1314 16171921 Three-Phase Smart Meter 230/400V, 3~100A/40mA 50/60Hz 24 25 Phase A current =5.000A 13 14 16 17 19 21 RS485 CHINT DTSU��� Phase B current =5.001A �x���/���V �~���A/��mA Pic �.�� CHINT meter Phase C current =5.002A Master(Mst) AC Breaker L�...
Page 43
7.2 How to browse the load power of your PV grid-tie plant on monitoring platform? If you want to browse load power of the system and how much energy (KWH) does it export to grid(inverter output power is used to power the load firstly and then the surplus energy will feed into grid).
Page 44
Secondly, go to plant page, if it shows the PV power, load power and grid power, which means the configuration is correct. Back to Plants list ID����� Compare Edit More String inverter Solar Station Partially Offline No Alerts Last update ����/��/�� ��:��:�� UTC+��:�� String inverter Solar Sta...
8. General Operation During normal operation, the LCD shows the current status of the inverter, including the current power, total generation, a bar chart of power operation and inverter ID, etc. Press the Up key and the Down key to see the current DC voltage, DC current, AC voltage, AC current, inverter radiator temperature, software version number and Wifi...
Page 46
ActiveP Q-Mode ReactP Exp_Mode Fun- ISO CT_Ratio � Fun RCD FeedIn SelfCheck Shunt ShuntQTY Island Generator G.CT Meter G.MFR G.FeedIn Limiter Setup G.Cap Feed-in Running param MPPT Num OF-Derate UF-Uprate WGRa WGraStr HardLim VRef SoftLim PowerLim VoltageRT Sunspec OK Cancel - ��...
Page 47
*Note: These parameters will be avaiable after the meter is EN����� connected successfully. Otherwise, it won't show. EN����� Attention: For running param detail on the LCD display, please IEC����� refer to the official Deye website https://www.deyeinverter.com CUSTOM VDE_���� UTE_C�� RD���� CEI_�_��...
Page 48
8.1 The initial interface From the initial interface, you can check power, daily generation, gross generation, invertert ID , model and time. �.�Kw SN-�� ����-��-�� ��:��:�� P - �� Kw Power: ��.��Kw Day : ���kWh Total : �� MWh State : Standby �...
Page 49
Grid Ua : ���.�V Ia : �.�A Grid Freq : ��.��Hz PF : �.��� Pic �.� AC running state information You can check the three phase voltage, current, and grid frequency. Total DC Power: �.���W Lcd���� Inv���� Pic �.� Inverter firmware version You can check the inverter LCD software Ver����...
8.1.1 Main Menu There are four submenu in the Main Menu. MENU Statistics 《 Fault Record ON/OFF Setup Pic �.� Main Menu 8.2 Statistics information There are five submenu in the statistics. MENU》 Statistics E-Day E-History E-Month Test Data 《 E-Year Pic �.�...
MENU》 Statistics》 E-History <����-����> �KWh �� �� �� �� �� �� �� �� �� �� Pic �.�� E-History This information is for technician’s reference. PV� ����� �k� ����� ���� PV� ����� �k� ����� ��� : ���� ����� �k� ����� ��� ����...
Page 53
8.4 ON/OFF setting MENU》 ON/OFF Turn ON Turn OFF 《 Pic �.�� ON/OFF setting Into each submenu through cursor. MENU》 ON/OFF》 Turn ON 《 Turn ON Cancel Pic �.�� ON set MENU》 ON/OFF》 Turn OFF 《 Turn OFF Cancel Pic �.�� OFF set - ��...
8.5 Parameter setting Setting includes system param, run param, protect param, comm.. param. All of these information for maintenance reference. MENU》 Setup System Param 《 Param Protect Param Comm. Param Pic �.�� Setting 8.5.1 System Param System Param MENU》 Setup 》 Time Set Language Set Display Set...
8.5.1.1 Time Set Time Set ����-��-�� ��:��:�� Cancel Pic �.�� System Param 8.5.1.2 Language Set Lauguage Set 简体中文 English 《 Polski Pic �.�� Lauguage set 8.5.1.3 Display Set Display Set Brightness Keep 《 Delay time ��S Cancel Pic �.�� Display set - ��...
Page 56
8.5.1.4 Factory data reset Factory data reset Confirm to reset 《 Cancel Pic �.�� Factory data reset set 8.5.1.5 Setting Restore Setting Restore Confirm to restore 《 Cancel Pic �.�� Factory data reset set Warning: Password required-- only for access-authorized engineer. Un-authorized access may avoid the warranty.
9. Repair and Maintenance String type inverter doesn’t need regular maintenance. However, debris or dust will affect heat sink’s thermal performance. It is better to clean it with a soft brush. If the surface is too dirty and affect the reading of LCD and LED lamp, you can use wet cloth to clean it up. High Temperature Hazard: When the device is running, the local temperature is too high and the touch can cause burns.
Page 61
Check the solar panel output connection. Failure in reading memory (EEPROM). Restart the inverter if the F�� Read the memory error fault still exists, contact your installer or Deye service. Failure in writing memory (EEPROM). Restart the inverter if the F�� Write the memory error fault still exists, contact your installer or Deye service.
Page 62
1. Check whether the 'BUSN' cable or driver board power supply cable is loose. F�� The DC busbar is unbalanced 2. Restart the inverter, if the fault still exists, contact your installer or Deye service. F�� DC end insulation error Hardly appear the code. Never ever happened so far. F��...
Page 63
1. Check AC current sensor and its circuit. F�� AC over current(one cycle) 2. Restart the inverter, if the fault still exists, contact your installer or Deye service. F�� DC over current Hardly appear the code. Never ever happened so far.
Page 64
Error code Description Ongrid - Three Phase F�� AC grid V over current Hardly appear the code. Never ever happened so far. F�� AC grid W over current Hardly appear the code. Never ever happened so far. F�� Reactor A phase over current Hardly appear the code.
Product: Grid-connected PV Inverter Models:SUN-120K-G01P3-EU-BM8;SUN-125K-G01P3-EU-BM8;SUN-130K-G01P3-EU-BM8; SUN-135K-G01P3-EU-BM8;SUN-136K-G01P3-EU-BM8; Name and address of the manufacturer: Ningbo Deye Inverter Technology Co., Ltd. No. 26 South YongJiang Road, Daqi, Beilun, NingBo, China This declaration of conformity is issued under the sole responsibility of the manufacturer. Also this product is under manufacturer’s warranty.
Need help?
Do you have a question about the SUN-120K-G01P3-EU-BM8 and is the answer not in the manual?
Questions and answers