Download Print this page

Advertisement

Quick Links

MONiMAX5400SE
Site Preparation
V01.00.00

Advertisement

loading
Need help?

Need help?

Do you have a question about the Monimax MONiMAX5400SE and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for HYOSUNG Monimax MONiMAX5400SE

  • Page 1 MONiMAX5400SE Site Preparation V01.00.00...
  • Page 2 As new technology, components, software and firmware become available, HYOSUNG reserves the right to change specifications without prior notice. All features, functions and operations described in this document may not be marketed by HYOSUNG in all parts of the world. In some instances, photographs are of equipment prototypes.
  • Page 3 Ⅵ. Weight ..................... 11 Service Area ................12 I. Minimum Installation ................12 II. Recommended Installation ..............12 III. Side Elevation ..................13 Installation Frame ............... 13 I. Bottom of ATM ..................13 Site Preparation © 2022 Hyosung TNS. All rights reserved.
  • Page 4 For printing, A4 size paper is recommended. The document is organized into sections covering the following topics: Introduction - this section Power Requirements Variant Details Each page has one column ~ three columns laid out as follows: Site Preparation © 2022 Hyosung TNS. All rights reserved.
  • Page 5 5. A security container shall be permitted to optionally be provided with a Site Preparation © 2022 Hyosung TNS. All rights reserved.
  • Page 6 ▪ Do not attempt to move the equipment alone. You may be ▪ If the above-mentioned abnormalities occur, immediately injured from dropping the heavy equipment. turn off the power, unplug the equipment and contact the service center. Site Preparation © 2022 Hyosung TNS. All rights reserved.
  • Page 7 MONiMAX5400SE Introduction ▪ If you ignore these symptoms, the equipment may catch on fire or cause electric shock. Site Preparation © 2022 Hyosung TNS. All rights reserved.
  • Page 8 MONiMAX5400SE Introduction Document revisions Revision Date Change summary V01.00.00 2022-4-6 New Publication Site Preparation © 2022 Hyosung TNS. All rights reserved.
  • Page 9 MONiMAX5400SE Variant Details II. Access for Device Exterior I. Front Elevation Site Preparation © 2022 Hyosung TNS. All rights reserved.
  • Page 10 MONiMAX5400SE Variant Details Ⅳ. Plan View III. Side Elevation Site Preparation © 2022 Hyosung TNS. All rights reserved.
  • Page 11 MONiMAX5400SE Variant Details Ⅵ. Weight Ⅴ. ISO View Site Preparation © 2022 Hyosung TNS. All rights reserved.
  • Page 12 MONiMAX5400SE Variant Details II. Recommended Installation Service Area I. Minimum Installation Site Preparation © 2022 Hyosung TNS. All rights reserved.
  • Page 13 MONiMAX5400SE Variant Details III. Side Elevation Installation Frame I. Bottom of ATM Site Preparation © 2022 Hyosung TNS. All rights reserved.
  • Page 14 MONiMAX5400SE Variant Details III. Anchor Detail II. Anchor Point Site Preparation © 2022 Hyosung TNS. All rights reserved.
  • Page 15 MONiMAX5400SE Variant Details Power Requirements I. The power for the site II. Power Consumption III. Thermal Output Site Preparation © 2022 Hyosung TNS. All rights reserved.