Page 1
Features - Stunning stylish European inspired design - Elegant durable stainless steel frame construction - 4 stage shower functions (Rainfall, Waterfall, Massage Spray, Hand Shower) - Thermostatic valve control minimize the chance of scalding Decor Star PL-029-SS Rev. A2 022018...
Page 2
Thank you for purchasing Decor Star products. Please read the information below and keep this installation guide for future reference. If you require assistance, please contact our customer service department at 1-800-879-1197, Monday - Friday 9AM - 5PM Pacifi c Time. Or by email at support@decorstarusa.com.
Page 3
696-G2001MF, 696-G2303MF, or 696-2403MF is recommended to expedite the installation process of the shut off valves. (NOTE: additional parts such as brass reducer / adapters may be required but not included with this product) Decor Star PL-029-SS Rev. A2 022018...
Page 4
NOTE: This distance vary by models, always take the actual measurement from the shower panel) (This is the distance from the oor to the bottom edge of the shower panel) Decor Star PL-029-SS Rev. A2 022018...
28.35” 4. Using a drill with a tile bit, drill the hole slowly into the tile. Do not drill into any piping or wiring in the wall. Insert the anchors into the wall. 1” Decor Star PL-029-SS Rev. A2 022018...
Page 8
After the shower panel is set properly on the wall, apply silicon sealant on both sides of the shower panel to prevent the unit from moving. (NOTE: Do not seal the bottom of the panel.) Decor Star PL-029-SS Rev. A2 022018...
7. When using spray cleaners, spray fi rst onto a soft cloth or sponge. Never spray directly onto the faucet as droplets can enter openings and gaps and cause damage. 8. After cleaning, rinse thoroughly with clean water to remove any cleaner residue. Decor Star PL-029-SS Rev. A2 022018...
The check valve should open when the center is pushed with tip of a pen or a cotton swab. The check valve should close automatically when no external pressure is applied to the center part of the valve. Decor Star PL-029-SS Rev. A2 022018...
Page 11
(NOTE: When inserting the thermostatic valve, make sure the marking on the tip of the valve is pointing up at 12 o’clock position as seen in Figure E) 10. Turn on water supply to the unit and test the system for leak. Decor Star PL-029-SS Rev. A2 022018...
Page 12
6. Once the temperature is set, install the Temperature Control Knob #3. (NOTE: The Safety Pin should be pointing at 12 o’clock) and tighten setscrew #2 Fig. F Fig. H Safety Pin Chrome Trim with Temperature Scale (4) Temperature Limit Stop (5) Termostatic Valve (7) Fig. G Decor Star PL-029-SS Rev. A2 022018...
Need help?
Do you have a question about the PL-029-SS and is the answer not in the manual?
Questions and answers