Table of Contents 1. Important information Safety information 2. Delivery and handling Transport Assembly Supplied components 3. The water heater design 4. Pipe connections General Dimensions and pipe connections Overall dimensions T&P valve Heat pump Horizontal Cold and hot water Docking 5.
Warranty Thank you for installing a new NIBE Megacoil. NIBE Megacoils are manufactured to the highest standard so NIBE are pleased to offer a comprehensive guar- Benchmark places responsibilities on both antee. The product is guaranteed for 24 months for manufacturers and installers.
Page 5
lnspection of the installation Current regulations require the heating installation to be inspected before it is commissioned. Inspection of the installation The inspection must be carried out by a suitably qualified person. Current regulations require the heating installation to be inspected before it is commissioned. The inspection must be carried out by a suitably d person.
INSTALLER TELEPHONE POSTCODE INSTALLERS NAME (PLEASE PRINT) INSTALLER NIBE REGISTERED NUMBER: • The NIBE Mega coil cylinder can only be installed with EMAIL INSTALLERS SIGNATURE INSTALLER'S COMPANY NAME ADDRESS For full terms and conditions, please see our website www.nibe.co.uk. ADDRESS a heat pump.
3. The water heater design (See page 8 for explanations) NIBE MEGACOIL 160, 200 and 300 NIBE MEGACOIL 400 NIBE MEGACOIL Horizontal XL29 Chapter 3 I The water heater design 7...
Ø 22 mm Horizontal/ Horizontal 3/4” Vertical Working thermostat immersion heater Connection, hot water, Ø 22 mm Connection, hot water circulation, Ø 1/2” (Not Megacoil 160 L. ) Docking connection, flow line Miscellaneous (from heat pump), Ø22 mm PF 3 Serial number plate...
4. Pipe connections 4 Pipe connections General Discharge pipes from tundishes must have a vertical Pipe installation must be carried out in accordance General Discharge pipes from tundishes shall have av vertical section of pipe at least 300 mm lang, before any elbows with current norms and directives.
2. Flush the system for some minute. Watch out for water splashes from the safety valve. 3. Close the valves and check the strainer. Dimensions, pipe connections and setting-out coordinates NIBE MEGACOIL 160, 200 and 300 NIBE MEGACOIL 400 NIBE MEGACOIL Horizontal...
Page 11
97,2 97,2 Secondary return. 3/4" F. Cold inlet (Except 160l.) Immersion heater. 3/4" F. Cold inlet NIBE MEGACOIL Horizontal E-E ( 1 : 6 ) peratur limiter orized valve. mary return. at Pum. (Red) 0 mm mm Cold inlet 1682 Temperatur limiter 1/2"...
XL3 Cold water inlet Ø22 mm XL8 Primary flow. Heat Pump. (Blue) 30 mm Immersion heater. Connecting to heat pump The heat pump supply and return are connected to the NIBE MEGACOIL. Vertical 1/2” F (Except 160 l.) 12 Chapter 4 I Pipe connections...
Connecting hot water circulation hot water circulation. hot water circulation. hot water circulation. hot water circulation. NIBE MEGACOIL 200, 300 and 400 have a hot water circulation. hot water circulation. e a connection that allows Titanium MegaCoil 200 & 300 hav Pressure reduction valve, check hot water circulation.
Page 14
To air source heat pump NIBE MEGACOIL can be docked with a Nibe air to water heat pump. 14 Chapter 4 I Pipe connections...
The Titanium Megacoil can accommodate up to two hot water sensors, one for SMO Controller display and one to control start and stop of heat pump. NIBE MEGACOIL can accommodate up to two hot water sensors, one for SMO Controller display and one to control start and stop of heat pump.
2. Vent the coil and the rest of the climate system via tions of warranty, please see our website www.nibe.co.uk. the relevant venting valves. www.nibe.co.uk. 2. Vent the coil and the rest of the climate system via the relevant venting valves.
Pressure drop diagram Pressure drop diagram, charge coil, horizontal coil Docking connection, flow line (XL8) and docking connection, return line (XL9). 18 Chapter 6 I Commissioning and adjusting...
Correct any fault before continuing. Expansion vessel. Correct any fault before continuing. Service actions Correct any fault before continuing. NIBE MEGACOIL 160, 200, 300 and 400 Service actions Mega Coil 160, 200 & 300 Service actions Safety valves Safety valves Mega Coil 160, 200 &...
°C Heat loss at 45°C kW/24h 1,24 1,62 2,01 2,39 2,11 bar/MPa Set pressure reducing valve Max temperature heat pump °C Max recommended NIBE heat pump S2125-12 S2125-12 S2125-16 S2125-20 S2125-12 F2050-10 F2050-10 F2050-12 F2050-16 F2050-10 Volume expansion vessel litre...
9. Item register Assembly, 6 Pipe connections, 9 Cleaning the climate system, 8 Cold and hot water, 13 Cold and hot water, 13 Connecting cold and hot water, 13 Commissioning and adjusting, 17 Dimensions and pipe connections, 10 Filling and venting, 17 General, 9 Pressure drop diagram, solar coil, 18 Hard water areas, 9...
Page 22
MAINS PRESSURE HOT WATER STORAGE SYSTEM COMMISSIONING CHECKLIST This Commissioning Checklist is to be completed in full by the competent person who commissioned the storage system as a means of demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference. Failure to install and commission this equipment to the manufacturer’s instructions may invalidate the warranty but does not affect statutory rights.
SERVICE RECORD It is recommended that your hot water system is serviced regularly and that the appropriate Service Record is completed. Service Provider Before completing the appropriate Service Record below, please ensure you have carried out the service as described in the manufacturer’s instructions. SERVICE 1 SERVICE 2 Date...
Page 24
NIBE Energy Systems Ltd 3C Broom Business Park Bridge Way Chesterfield S41 9QG Phone 0845 095 1200 Fax 0845 095 1201 info@nibe.co.uk www.nibe.co.uk...
Need help?
Do you have a question about the MEGACOIL 160 and is the answer not in the manual?
Questions and answers