BLAUBERG BLAUAIR RtH User Manual

Air handling unit

Advertisement

Quick Links

Air hAndling unit
BLAUAIR RtH
EN
USER'S MANUAL

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BLAUAIR RtH and is the answer not in the manual?

Questions and answers

Summary of Contents for BLAUBERG BLAUAIR RtH

  • Page 1 Air hAndling unit BLAUAIR RtH USER’S MANUAL...
  • Page 2: Table Of Contents

    BlAuAir rh www.blauberg-na.com CONTENTS Safety requirements ..................................2 Purpose ....................................... 5 Delivery set ....................................... 5 Designation key .................................... 6 Technical data ....................................7 Unit design and operation logic ............................8 Installation and set-up ................................9 Connection to power mains ..............................11 Technical maintenance ................................
  • Page 3 BlAuAir rh www.blauberg-na.com DO NOT ALLOW CHILDREN TO OPERATE THE UNIT. DO NOT STORE ANY EXPLOSIVE OR HIGHLY FLAMMABLE SUBSTANCES IN CLOSE PROXIMITY TO THE UNIT. DO NOT OPEN THE UNIT DURING OPERATION. DO NOT BLOCK THE AIR DUCT WHEN THE UNIT IS SWITCHED ON.
  • Page 4 BlAuAir rh www.blauberg-na.com DO NOT MOUNT ROOM-TO-ROOM FAN IN A FIRE-RATED WALL. POWER OFF THE POWER SUPPLY PRIOR TO ANY OPERATIONS WITH THE UNIT. THE UNIT MUST BE CONNECTED TO POWER SUPPLY BY A QUALIFIED ELECTRICIAN. THE RATED ELECTRICAL PARAMETERS OF THE UNIT ARE GIVEN ON THE MANUFACTURER’S LABEL.
  • Page 5: Purpose

    BlAuAir rh www.blauberg-na.com PURPOSE CAUTION! FOR GENERAL VENTILATING USE ONLY. DO NOT USE TO EXHAUST HAZARDOUS OR EXPLOSIVE MATERIALS AND VAPORS AS WELL AS FLAMMABLE MIXTURES, EVAPORATION OF CHEMICALS, STICKY SUBSTANCES, FIBROUS MATERIALS, COARSE DUST, SOOT AND OIL PARTICLES OR ENVIRONMENTS FAVOURABLE FOR THE FORMATION OF HAZARDOUS SUBSTANCES (TOXIC SUBSTANCES, DUST, PATHOGENIC GERMS).
  • Page 6: Designation Key

    BlAuAir rh www.blauberg-na.com DESIGNATION KEY...
  • Page 7: Technical Data

    BlAuAir rh www.blauberg-na.com TECHNICAL DATA The unit is designed for indoor or sheltered use. The installation conditions must prevent ingress of atmospheric precipitations and direct solar radiation at the ambient temperatures from -31 °F up to +122 °F The frost protection for the water drainage and connected pipelines must be provided during sub-zero ambient temperatures (if the unit is equipped with an air cooler).
  • Page 8: Unit Design And Operation Logic

    BlAuAir rh www.blauberg-na.com Model А1 75.4 71.5 23.6 89.0 68.1 47.2 30.3 21.7 30.3 BL12 RtH 9000 The full technical data list is stated in the supplied technical data sheet. UNIT DESIGN AND OPERATION LOGIC UNIT DESIGN 1: protective dampers with electric actuator [optional]...
  • Page 9: Installation And Set-Up

    BlAuAir rh www.blauberg-na.com INSTALLATION AND SET-UP IF A UNIT HAVING PROVISION FOR CONNECTION OF A FRESH AIR DISCHARGE DUCT DOES NOT ALSO HAVE PROVISION FOR CONNECTION OF AN INDOOR AIR INTAKE DUCT, APPLICABLE INSTALLATION CODES MAY LIMIT THE UNIT TO INSTALLATION ONLY IN A SINGLE-STORY RESIDENCE.
  • Page 10 BlAuAir rh www.blauberg-na.com TThe design of the unit sections is such that they must not be cantilevered. Each section must be supported at the intended locations. The upper sections that protrude over the edge of the lower sections must be supported by a suitable structure (attachment/ suspension elements are not included).
  • Page 11: Connection To Power Mains

    BlAuAir rh www.blauberg-na.com CONNECTION TO POWER MAINS THE UNIT CONNECTION TO THE POWER SUPPLY MUST BE PERFORMED BY DULY QUALIFIED PERSONNEL MADE FAMILIAR WITH THE PRESENT OPERATION MANUAL. THE UNIT IS INTENDED FOR CONNECTION TO AC MAINS SUPPLYING THE VOLTAGE COMPLIANT WITH THE TECHNICAL SPECIFICATION CHART.
  • Page 12: Technical Maintenance

    BlAuAir rh www.blauberg-na.com 3. Lead the power cable through the cable gland. Fix the power cable with clamps (not included in delivery and ordered separately) and connect it to the terminal block in accordance with the wiring diagram. Reassemble the unit in the reverse order TECHNICAL MAINTENANCE WARNING –...
  • Page 13: Storage And Transportation Regulations

    BlAuAir rh www.blauberg-na.com Open the service doors to access the filters. BL03 BL02 Remove the filter elements. Remove the two butterfly bolts that Open the two latches securing the fix the retaining clamp. pressure plate. To access the heat exchanger remove the service panel. Disconnect the socket from the actuator. Pull the heat exchanger out.
  • Page 14: Manufacturer's Warranty

    Production meets standard operating requirements in the USA and Canada. Blauberg warrants to the original purchaser of the unit that it will be free from defects in materials or workmanship for a period of 24 months from the date of original purchase. The Blauberg warrants to the original purchaser of the unit that the integrated control unit will be free from defects in materials and workmanship for a period of 24 months from the date of original purchase.
  • Page 15: Certificate Of Acceptance

    BlAuAir rh www.blauberg-na.com CERTIFICATE OF ACCEPTANCE Unit Type Air handling unit Model Serial Number Manufacture Date Quality Inspector’s Stamp SELLER INFORMATION Seller Address Phone Number E-mail Purchase Date This is to certify acceptance of the complete unit delivery with the user’s manual. The warranty terms are acknowledged and accepted.
  • Page 16 BUSA192-2EN-03...

Table of Contents