Hide thumbs Also See for MEZZO1000-AUB:
Table of Contents

Advertisement

Quick Links

INSTALLER: Leave this manual with party responsible for use and operation.
OWNER: Retain this manual for future reference.
NOTICE: DO NOT discard this manual!
Models:
NOTE: NOT INTENDED FOR
NOTE:
FIREPLACE INSERT.
DO NOT PLACE ARTICLES ON OR AGAINST THIS APPLIANCE.
DO NOT USE OR STORE FLAMMABLE MATERIALS NEAR THIS APPLIANCE.
DO NOT SPRAY AEROSOLS IN THE VICINITY OF THIS APPLIANCE WHILE IT IS IN OPERATION.
DO NOT MODIFY THIS APPLIANCE.
Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21
Installation Manual
Installation and Appliance Setup
Ref No: GMK10222
AS/NZS 5263.1.3
WARNING:
FIRE OR EXPLOSION HAZARD
Failure to follow safety warnings exactly
could result in serious injury, death, or
property damage.
• DO NOT store or use gasoline or other flam-
mable vapors and liquids in the vicinity of this
or any other appliance.
• What to do if you smell gas
- DO NOT try to light any appliance.
- DO NOT touch any electrical switch. DO
NOT use any phone in your building.
- Leave the building immediately.
- Immediately call your gas supplier from
a neighbor's phone. Follow the gas sup-
plier's instructions.
- If you cannot reach your gas supplier, call
the fire department.
• Installation and service must be performed
by a qualified installer, service agency, or the
gas supplier.
DANGER
DO NOT TOUCH GLASS
NEVER ALLOW CHILDREN
A barrier designed to reduce the risk of
burns from the hot viewing glass is provided
with this appliance and shall be installed for
the protection of children and other at-risk
individuals.
HOT GLASS WILL
CAUSE BURNS.
UNTIL COOLED.
TO TOUCH GLASS.
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MEZZO1000-AUB and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for HEAT GLO MEZZO1000-AUB

  • Page 1 DO NOT USE OR STORE FLAMMABLE MATERIALS NEAR THIS APPLIANCE. DO NOT SPRAY AEROSOLS IN THE VICINITY OF THIS APPLIANCE WHILE IT IS IN OPERATION. DO NOT MODIFY THIS APPLIANCE. Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 2: Table Of Contents

    C. Securing and Leveling the Appliance ....34  = Contains updated information. Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 3: Installation Standard Work Checklist

    _____________________________________________________________________________________ _________________________________________________________________________________________________ Comments Communicated to party responsible ____________________ by ______________________on ___________ (Builder / Gen. Contractor/) (Installer) (Date)  = Contains updated information. 2304-975B 3/16 Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 4: Product Specific And Important Safety Information

    If the provided assembly is removed, it is recommended that a new gas shut-off be installed inside the envelope of the appliance before the gas valve. Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 5: High Altitude Installations

    G. Electrical Codes All electrical safety testing has been done following the EN 60335-2-102 standard. Local codes apply. Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 6: Getting Started

    Flat blade screwdriver 1/2 - 3/4 in.(13-19 mm) length, #6 or #8 Self-drilling screws Caulking material (300 ºF (149 ºC) minimum continuous exposure rating) Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 7: Inspect Appliance And Components

    Call a qualified service technician to inspect the appliance and to replace any part of the control system and/or gas control which has been under water. Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 8: Framing And Clearances

    7-1/4 7-1/4 8-9/16 8-9/16 8-7/8 8-7/8 2-3/4 2-3/4 48-3/16 1224 1524 23-3/4 23-3/4 17-1/8 17-1/8 30-3/4 30-3/4 Figure 3.1 Appliance Dimensions - MEZZO1000-AUB, MEZZO1300-AUB Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 9 47-3/4 1213 15-5/8 2-3/8 48-1/2 1232 8-9/16 24-1/2 8-9/16 7-1/4 1600 8-7/8 8-9/16 2-3/4 23-3/4 1829 30-3/4 17-1/8 Figure 3.2 Appliance Dimensions - MEZZO1600-AUB Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 10 41-3/4 1060 15-5/8 2-3/8 42-1/2 1080 8-9/16 24-1/2 8-9/16 7-1/4 1600 8-7/8 8-9/16 2-3/4 23-3/4 1524 30-3/4 17-1/8 Figure 3.3 Appliance Dimensions - MEZZO1300ST-AUB Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 11 13-1/8 13-1/8 37-3/16 49-3/16 1249 61-3/16 1554 40-5/16 1024 52-5/16 1329 64-5/16 1634 Figure 3.4 Clean Face Trim Front (Inside Fit) Decorative Front Dimensions Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 12: Clearances To Combustibles

    1797 1530 2550 10.14 and 10.15. Inches 79-1/2 72-1/4 112-3/8 31-3/4 18-3/4 MEZZO1600-AUB Millimeters 1835 2013 2854 Figure 3.5 Appliance Locations: MEZZO-AUB Single-Sided Models Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 13: Constructing The Appliance Chase

    (or an equivalent method may be used) to achieve maximum air tightness. Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 14 Construct platform in accordance with local building codes.  **** For Installations with vinyl flooring. See Section 3.E. Figure 3.7 Clearances to Combustibles MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1600-AUB Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 15 Construct platform in accordance with local building codes.  **** For Installations with vinyl flooring. See Section 3.E. Figure 3.8 Clearances to Combustibles - MEZZO1300ST-AUB Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 16: Floor Protection

    110 °F (43 °C) in a room with ambient temperature of 70 °F (21 °C). Consult flooring specifica- tions to ensure compatibility. Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 17: Termination Location And Vent Information

    53.1°-56.3° ............2 130 56.3°-59.0° ............2 290 59.0°-60.3° ............2 440 *910 mm minimum in snow regions Figure 4.1 Minimum Height From Roof To Lowest Discharge Opening Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 18: Chimney Diagram

    500 mm of the opening and discharging in the direction of the opening. 4. Clearance from a flue terminal to a LP cylinder shall be a minimum of 1 meter. MINIMUM CLEARANCES REQUIRED FOR BALANCED FLUE TERMINALS OR THE FLUE TERMINALS OF OUTDOOR APPLIANCES Figure 4.3 Minimum Clearances for Termination Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 19: Approved Pipe

    Figure 4.4 may be painted, but painting is not required. NOTICE: Before painting, contact your dealer for information on the appropriate high temperature paint. Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 20: Vent Diagrams

    • Horizontal termination cap should have a 1/4 in. (6mm) downward slant to allow any moisture in cap to be BREAK released. HERE Figure 4.6 Break the Exhaust Restrictor Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 21 = 63 ft. (19.2 m) Maximum = 63 ft. (19.2 m) Maximum = 24 ft. (7.3 m) Maximum = 24 ft. (7.3 m) Maximum Figure 4.9 Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 22 = 63 ft. (19.2 m) Maximum = 63 ft. (19.2 m) Maximum = 24 ft. (7.3 m) Maximum = 24 ft. (7.3 m) Maximum INSTALLED HORIZONTALLY Figure 4.10 Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 23 = 63 ft. (19.2 m) Maximum = 63 ft. (19.2 m) Maximum = 24 ft. (7.3 m) Maximum = 24 ft. (7.3 m) Maximum Figure 4.11 Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 24 Note: If installing a vertical vent/termination off the top of the appliance, the optional exhaust restrictor may be needed. Note: Use DVP Series components only. Figure 4.12 Vertical Vent Maximum Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 25 6.3 m 8 ft. 2.4 m 23 ft. 7.1 m = 63 ft. (19.2 m) Maximum = 23 ft. (7.1 m) Maximum Total Figure 4.13 Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 26 8 ft. 2.4 m 23 ft. 7.1 m = 63 ft. (19.2 m) Maximum = 23 ft. (7.1 m) Maximum INSTALLED HORIZONTALLY Figure 4.14 Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 27: Power Vent Configurations

    (12.19 m) (15.24 m) (18.29 m) (21.34 m) (24.38 m) (27.43 m) ALLOWABLE VENT RUNS ALLOWED Table 4.1 Allowable Vent Runs - Horizontal Termination Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 28: Vent Clearances And Framing

    (1) in. (25.4 mm) above the center of the horizontal vent pipe. Note: Measurements were taken with 2 ft. (610 mm) vertical section of pipe. Figure 5.2 Wall Penetration Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 29: Install The Ceiling Firestop

    INSTALL ATTIC INSULATION SHIELDS BEFORE OR AFTER INSTALLATION OF VENT SYSTEM CEILING FIRESTOP CEILING FIRESTOP INSTALLED BELOW CEILING INSTALLED ABOVE CEILING Figure 5.4 Installing the Attic Shield Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 30: Installing The Optional Heat-Zone ® Kit

    REQUIRED FOR 90 DEGREE BEND 457 mm CEILING REGISTER WALL REGISTER FLOOR REGISTER TWO DUCT KITS WALL REGISTER WALL REGISTER Figure 5.5 Air Duct Runs Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 31 152 mm ROUND MOUNTING BRACKET INSULATED AIR DUCT FRONT OF FAN HOUSING Figure 5.9 Duct Attachment Figure 5.7 Fan Housing Mounting 2 x 6 Wall Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 32: Operation

    1. Service and maintain the gas heater per instructions. 2. Keep the air register(s) clean and free of any blockage. 3. Reference IPI Plus instructions with remote control for fan auxiliary control. Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 33: Appliance Preparation

    5. Place the fiberglass rope ring over the gasket. Ensure both the gasket and the rope ring are seated on the top of the appliance. Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 34: Securing And Leveling The Appliance

    FLANGE FLANGE FLANGE Figure 6.6 Nailing Tabs Figure 6.5 Nailing Tabs Installation Position Shipping Position NAILING TABS BOTH SIDES Figure 6.4 Nailing Tab Locations Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 35: Installing Non-Combustible Facing Material

    • Use a wet or dry towel or soft brush to remove dust or dirt from facing material. • See Section 10 for finishing materials guidelines. Figure 6.7 Install Factory-Included Non-Combustible Facing Material Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 36: Venting And Chimneys

    Use screws no longer than 1/2 in. (13 mm). If predrilling screw holes, DO NOT penetrate Figure 7.4 Seams inner pipe. Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 37: Assemble Slip Sections

    • Only outer pipes are sealed, sealing the inner flue is not required. • All unit collar, pipe, slip section, elbow and cap outer flues shall be sealed. Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 38: Disassemble Vent Sections

    Figure 7.10 • Pull carefully to separate the pieces of pipe. Figure 7.9 Rotate Seams for Disassembly Figure 7.10 Align and Disassemble Vent Sections Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 39: Vertical Termination Requirements

    • Caulk the perimeter of the flashing where it contacts the roof surface. See Figure 7.12. • Caulk the overlap seam of any exposed pipe sections that are located above the roof line. Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 40: Install Vertical Termination Cap

    • Rest the small leg on the extended heat shield on top of the pipe section to properly space it from the pipe section. Important Notice: Heat shields may not be field constructed. Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 41: Install Horizontal Termination Cap

    HEAT SHIELD OVERLAP WALL SHIELD FIRESTOP SLIP SECTION CAN BE EXTENDED INNER VENT SHEATHING OUTER VENT INTERIOR EXTERIOR Figure 7.15 Venting Through the Wall Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 42: Electrical Information

    CONTROL MODULE CONTROL MODULE JUNCTION CORD JUNCTION CORD LED POWER SUPPLY LED POWER SUPPLY Figure 8.3. Valve Cavity (Lower Access Panel Removed) Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 43: Wiring Requirements

    GROUND BROWN ORANGE GREEN (PILOT) (MAIN) GROUND LED CONTROL BATTERY PACK 6V DC LED LIGHT TRAY Figure 8.4 IntelliFire™ Plus Wiring Diagram with Remote Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 44: Gas Information

    3. Unplug the 6V transformer from the junction cord. This will turn the power off to the appliance. Figure 9.1. Valve Pressure Taps. Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 45 Figure 9.5. Gas Fitting Access with Vanity Panel Removed BURNER (MEZZO1000-AUB MEZZO1300-AUB MEDIA TRAY MEZZO1300ST-AUB MODELS) BURNER (MEZZO1600-AUB MODELS) Figure 9.3. Media Tray with Burner and Pilot Shield Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 46: Gas Connection

    Leak test all gas line points and the gas control valve prior to and after starting the gas appliance. Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 47: Air Shutter Setting

    GLASS REFRACTORY Opening= Opening= 3/8 in. (10 mm) Full Open LOG KIT 3/8 in. (10 mm) Full Open DETAIL Figure 9.6 Air Shutter Location Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 48: Finishing

    Inadequate air space could To Avoid Sheetrock Cracking: cause overheating and fire. DO NOT Use a quick set or light weight joint compound. Use flat paint. Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 49: Facing Material

    If desired finishing includes a painted wall, 100% acrylic latex with compatible primer is recommended around this appliance. Oil-based or standard acrylic paints may dis- color due to heat exposure. Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 50 Refer to Section 1.E and 1.F of this manual for definitions Figure 10.2 Finishing and Facing Materials - Single-sided Models and qualifications of non-combustible and combustible materials. Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 51 • Over heating and fire could occur. TRIM RING INSTALLED Figure 10.4 Non-Combustible Finish Material Diagram for 1 - 4 in. (25 - 102 mm) Thick Inside Fit Method Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 52 51-1/8 in. (1299 mm) MEZZO1300-AUB, MEZZO1300ST-AUB 63-1/8 in. (1603 mm) MEZZO1600-AUB 15-3/4 in. FIREPLACE VIEWING AREA (400 mm) Figure 10.6 Finished Opening Dimensions - Inside Fit Method Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 53: Mantel And Wall Projections

    Minimum Vertical and Maximum Horizontal Dimensions of Combustibles - MEZZO1000-AUB Figure 10.8 Minimum Vertical and Maximum Horizontal MEZZO1300-AUB, MEZZO1300ST-AUB Dimensions of Combustibles - MEZZO1600-AUB Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 54: Decorative Front Dimensions For Finishing

    See Appliance Dimension Diagram-Dimension B Figure 3.1 (MEZZO1000-AUB, MEZZO1300-AUB) Figure 3.2 (MEZZO1600-AUB) Figure 3.3 (MEZZO1300ST-AUB) Figure 10.10 Mantel Leg or Wall Projections (Acceptable on both sides of opening) Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 55: Appliance Setup

    BOTTOM RETAINING LIP Clean/vacuum any sawdust that may have accumulated Figure 11.1 Fixed Glass Assembly inside the firebox or underneath in the control cavity. Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 56: Install Glass Refractory Panels

    Figure 11.6 Retaining Bracket Installation - Back peat for other side. HAND BEND TAB HAND BEND TAB Figure 11.7 Retaining Bracket - Side Panel Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 57: Retaining Bracket

    (2 mm - 3 mm) Figure 11.9 Gap Between Tab and Side Glass Panel: 1/16 IN. - 1/8 in. 2300-946 Figure 11.10 Retaining Bracket Installation - See-Through Models Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 58: Install Media

    Verify that the media placement jig is correctly installed in place in the appliance. See Figure 11.13. Figure 11.13 Media Placement Jig in Place Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 59 • Fog the media to the desired look. front of the pilot assembly. SCREW SCREW Figure 11.15 Remove Media Placement Jig Figure 11.18 Fogging the Media Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 60: Troubleshooting

    Avoid using media pieces larger than two inches in diameter, these can be disruptive to the flame patterns. If you find exra large media pieces, discard. Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 61: Reference Materials

    5 in. 12 in. (127 mm) (305 mm) 6 in. (152 mm) DVP-HVS (Vent Support) DVP-WS (Wall Shield Firestop) Figure 12.1 DVP Vent Components Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 62 3/8 in. (10 mm) 1 in. (25 mm) 7-3/4 to 10-3/8 in. (197 to 264 mm) DVP-FBHT FireBrickTermination Cap Figure 12.2 DVP Vent Components Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 63 14 in. 27-1/2 in. 24-5/8 in. (356 mm) (127 mm) (625 mm) DRC-RADIUS RF6M Cap Shield Roof Flashing Multi-pak Figure 12.3 DVP Vent Components Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 64 Note: A PVLP-HS heat shield is available and sold separately. Use if the PVLP-SLP is installed in a high traffic area. Figure 12.4 PVLP-SLP-AU Vent Components Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...
  • Page 65: Accessories

    Please contact your Heat & Glo dealer with any questions or concerns. For the location of your nearest Heat & Glo dealer, please visit www.heatnglo.com. Printed in U.S.A. - Copyright 2021 Heat & Glo • MEZZO1000-AUB, MEZZO1300-AUB, MEZZO1300ST-AUB, MEZZO1600-AUB Installation Manual • 2304-973 Rev. Y • 11/21...

This manual is also suitable for:

Mezzo1300-aubMezzo1300st-aubMezzo1600-aub

Table of Contents