Page 1
LABCONCO CORPORATION 8811 Prospect Ave, Kansas City, MO 64132 (816) 333-8811 or (800) 821-5525 • (816) 363-0130 fax • labconco.com ® Quick Start Installation Guide for Purifier Class II Biosafety Cabinets Preparations Do not discard packaging until you have identified all parts that were shipped, and the products operate properly.
Page 2
Location Flat, level surface space to accommodate each component’s footprint with a minimum 6" clearance on top, back, and sides. Proper Electrical Supply Each cabinet must have a dedicated single-phase non-GFCI circuit. 115V models o A 15 Amp outlet is required for: ...
If installing the cabinet onto a Labconco base stand, first follow assembly instructions for the base stand. Carefully secure the BSC to the base stand using the provided hardware in accordance with the directions provided with the base stand.
Page 4
Drop each bolt through the mounting tab hole and into each hole on the stand’s top rail Carefully lower the cabinet onto the stand After the cabinet is in place, remove each attachment bolt (one at a time) Flip over each bolt to install it up through the stand’s top rail, and add the associated washers and nut before tightening ...
Page 5
Final Steps All Class II BSCs must be tested by a qualified Certifier prior to use. Depending on application requirements, some Type A2 and C1 BSCs may need to be connected to exhaust ductwork. All Type B2 BSCs must be connected to exhaust ductwork to function properly.