Important - please read Contents of Packaging Please read these instructions carefully before starting installation and keep for Left future reference. Remove all packaging and check the product for missing parts or damage before starting installation. Right Any alterations made to this product and fittings may infringe water regulations and will invalidate the guarantee.
Installation Operation: Identify the left and right pillars and Cold position on the bath. From the underside of the bath fit the rubber washers and nuts. Temporarily hand tighten the nuts. Place a rubber washer in each of the locking nuts on the valve and screw onto the pillars and tighten.
Commissioning Cleaning instructions: The valve has been factory set under balanced pressures and hot water supply at 65°C. Our products are finished to the highest standard and due care needs to be taken to When your specific operating conditions are significantly different from the above, the ensure their looks are retained.
Page 6
•The extended guarantee is only available if you have completed the Guarantee Registration Process. This can be done via the VADO website or via phone to our aftersales team. Registration must be completed within 6 months from date of purchase.
Need help?
Do you have a question about the AXCES AX-SIR-131T-CP and is the answer not in the manual?
Questions and answers