Important - please read Contents of Packaging Please read these instructions carefully before starting installation and keep for FIXING KIT BOX future reference. Remove all packaging and check the product for missing parts or damage before starting installation. Any alterations made to this product and fittings may infringe water regulations and will invalidate the guarantee.
Note: The valve must be connected to rigid pipe work for support. Note: If you would like easy-fit brackets for ease of installation, please contact vado to purchase AX-SH-049EFB-RO-CP. Shower handset and hose (not supplied) Place one of the rubber washers into the nut end of the hose and attach it to the mixer outlet.
Commissioning Cleaning instructions: The valve has been factory set under balanced pressures and hot water supply at 65°C. Our products are finished to the highest standard and due care needs to be taken to When your specific operating conditions are significantly different from the above, the ensure their looks are retained.
Page 6
•The extended guarantee is only available if you have completed the Guarantee Registration Process. This can be done via the VADO website or via phone to our aftersales team. Registration must be completed within 6 months from date of purchase.
Need help?
Do you have a question about the Axces SIRKEL AX-SIR-123T-CP and is the answer not in the manual?
Questions and answers