PRE-ASSEMBLY STEP 1 - SORTING PARTS It is critical for ease of assembly that you take the time to sort and organize the parts and hardware. HARDWARE PARTS: • We recommend that you have a separate table to organize the hardware. •...
Page 7
STEP 4 - MESH PANEL HOOK INSTALLATION A6P00535 MESH PANEL HOOK (x48) - INSERT 24 MESH PANEL HOOKS INTO EACH TRACK ON THE LONG SIDES OF THE GAZEBO LONG SIDE TRACK 0535 (x48) MESH PANEL HOOK ASSEMBLY...
Page 9
STEP 58 - CORNER CAP INSTALLATION PartNo BOM DESCRIPTION H 100392 SCREW PWH 8x3/4 BLK A6P00801 RIGHT CORNER CAP A6P00800 LEFT CORNER CAP (x2) (x2) -ATTACH THE CORNER CAPS INTO THEIR DESIGNATED LOCATIONS BY MATCHING THE SLANT. -TIGHTEN THE SCREWS FROM THE PREVIOUS STEP THAT TEMPORARILY HELD THE HOOKS IN PLACE.
Page 11
STEP 7 - SOFFIT MESH ATTACHMENT PartNo BOM DESCRIPTION H 100392 SCREW PWH 8x3/4 BLK A6P00995 16x12 SOFFIT MESH PANEL (x2) - LOCATE THE INTEGRATED MAGNET IN THE EDGE OF THE SOFFIT MESH. THIS IS THE INSIDE EDGE WHICH WILL BE ATTACHED FIRST TO THE FACE OF THE OUTER BEAM.
STEP 8 - MESH PANEL INSTALLATION � A6P00736 16X12 MESH PANEL A6P00735 16X12 MESH PANEL (x2) (x2) 1. EACH PANEL GOES AROUND THE OUTSIDE OF THE POSTS AND COVERS ONE HALF OF THE 16FT SIDE AND ONE HALF OF THE 12FT SIDE. PAY CAREFUL ATTENTION TO THE MESH PANEL PART NUMBERS AS YOU WILL ALTERNATE THEM WHEN HANGING (SEE IMAGE) 2.
Need help?
Do you have a question about the NORWOOD 9230200 and is the answer not in the manual?
Questions and answers